iTAC Advance Issue 2, Mar 2018.pdf - 第24页

24 Issue 2 , Mar 18 Equipment assignment Equipment is each specific consumable which is necessary for manufacturing of selected product on particular station (on printer it is e.g. screen, squeegee, tooling, etc.) ❑ To a…

100%1 / 77
23
Issue 2, Mar 18
❑ Now can be edited (edit or assign BOM / assign equipment, etc.).
❑ Finally the new WP has to be released by right clicking and selecting release version.
❑ Select yes to invalidate previous version or select no to keep previous version valid.
NOTES:
24
Issue 2, Mar 18
Equipment assignment
Equipment is each specific consumable which is necessary for manufacturing of selected
product on particular station (on printer it is e.g. screen, squeegee, tooling, etc.)
❑ To assign equipment to the work plan select required work plan, right click and then select
edit.
❑ Select required work step, right click and select assign equipment.
❑ Select the part number, and then use drag and drop to add equipment.
25
Issue 2, Mar 18
Note: The equipment groups are AND linked. The equipment and equipment device classes
within an equipment group are OR linked. For equipment setup, this means that from every
group at least one valid equipment must be rigged to the station of this work step!
NOTES: