KE-2030使用说明书.pdf - 第443页
6 − 97 Ⅱ Ⅱ Ⅱ Ⅱ When t here is no continuous product ion fil e (1) W hen the system re- clamps a board See the previous section “I . W hen there is a continuous production f ile”. ◆ W hile t he system is loading a boar d:…

6 − 96
■
■■
■
When the system starts production after loading a board without performing the
continuous production (new production or suspended production)
Information on the
PWB transport path
obtained when
production was
interrupted
Whether there is a board
on the PWB transport
path
Image of the PWB transport condition
Step
No.
Whether to
resume
production
Production
operation
Left Right Left Right Left Right
Operation after you press
the <START> key
①
Yes
Yes
②
Yes
None
③
None
Yes
After ejecting a board, the
system loads a new board
before starting production, and
then starts a new production
or performs the continuous
production (be careful to start
production).
④
No
Production
after a
board is
loaded
(when you
select
“Load a
new PWB”)
None
None
After loading a new board
before starting production, the
system starts new production
or resumes the suspended
production.

6 − 97
Ⅱ
ⅡⅡ
Ⅱ
When there is no continuous production file
(1) When the system re-clamps a board
See the previous section “I. When there is a continuous production file”.
◆
While the system is loading a board: it operates in the manner as described
under
④
,
⑤
and
⑥
.
◆
When the system ejects a board when you select to re-clamp a board: it
operates in the manner as described under
⑧
.
■
When the system starts a new production or resumes the suspended production after
loading a board
Information on the
PWB transport path
obtained when
production was
interrupted
Whether there is a board
on the PWB transport
path
Image of the PWB transport condition
Step
No.
Whether to
resume
production
Production
operation
Left Right Left Right Left Right
Operation after you press
the <START> key
①
Yes
Yes
②
Yes
None
③
None
Yes
Not selectable
④
None
None
⑤
Yes Yes
No
information
No
information
After ejecting a board, the
system loads a new board
before starting production, and
performs the continuous
production (see Note).
⑥
Yes
Yes
⑦
Yes
None
⑧
None
Yes
Not selectable
⑨
None
None
⑩
Yes None
No
information
No
information
After ejecting a board, the
system loads a new board
before starting production, and
performs the continuous
production (see Note).
⑪
Yes
Yes
⑫
Yes
None
⑬
None
Yes
Not selectable
⑭
None
None
⑮
None Yes
No
information
No
information
After ejecting a board, the
system loads a new board
before starting production, and
performs the continuous
production (see Note).
⑯
Yes
Yes
⑰
Yes
None
⑱
None
Yes
⑲
None
None
⑳
No
Production
after a
board is
loaded
(when you
select
“Load a
new PWB”)
None None
No
information
No
information
After loading a board before
start of production, the system
resumes the suspended
production.
Note: If you interrupt production when the system requires a continuous production file, the system operates in
the same manner as it does when there is no PWB transport path information if there is no continuous
production file.

6 − 98
(2) If there is a board on the PWB transport path when you select the radio button “Load
a new PWB”, and the system ejects the board
See the previous section “I. When there is a continuous production file”.
◆ If you interrupt production (regardless of whether the system uses a continuous
production file), the system operates in the manner described under ④, ⑤ and
⑥.
■ When the system starts a new production or resumes the suspended production after
re-clamping a board
Information on the
PWB transport path
obtained when
production was
interrupted
Whether there is a board
on the PWB transport
path
Image of the PWB transport condition
Step
No.
Whether to
resume
production
Production
operation
Left Right Left Right Left Right
Operation after you press
the <START> key
①
Yes
Yes
After a board is clamped
again, the system resumes the
production without loading a
board before starting
production
②
Yes
None
Error
③
None Yes
Error
④
None None
Not selectable
⑤
Yes Yes
No
information
No
information
After re-clamping a board, the
system performs the
continuous production without
loading any board (Be careful).
⑥
Yes
Yes
Error
⑦
Yes
None After a board is clamped
again, the system resumes the
production without loading a
board before starting
production
⑧
None Yes
Error
⑨
None None
Not selectable
⑩
Yes None
No
information
No
information
After re-clamping a board, the
system performs the
continuous production without
loading any board (Be careful).
⑪
Yes
Yes
Error
⑫
Yes
None
Error
⑬
None Yes
After a board is clamped
again, the system resumes the
production without loading a
board before starting
production
⑭
None None
Not selectable
⑮
None Yes
No
information
No
information
After re-clamping a board, the
system performs the
continuous production without
loading any board (Be careful).
⑯
Yes
Yes
⑰
Yes
None
⑱
None Yes
Error (No board)
⑲
None None
Not selectable
⑳
No
Production
after a
board is
clamped
(when you
select
“Re-clamp
current
PWB”)
None None
No
information
No
information
Error (No board)
Note: If you interrupt production when the system requires a continuous production file, the system operates in
the same manner as it does when there is no PWB transport path information if there is no continuous