4OM-1208-011_w.pdf - 第165页
3-15 AIVEMT -ID Erroe ID Error Name, Description, Cause, and Remedy 422301 Cnvr . Positioning 1 Error The carrying in operation was not able to begin. ----- 422302 Cnvr . Positioning 1 Error The error was detected while …

3-14
AIVEMT-ID
Erroe ID Error Name, Description, Cause, and Remedy
422101 Cnvr. Positioning 1 Overtime
PCB from inp. buffer Cnvr. was not received.
Please continue the work after checking the PCB on a conveyor.
422102
Cnvr. Positioning 1 Overtime
PCB moving to inp. Buffer cnvr. was not received.
Please continue the work after checking the PCB on a conveyor.
422103
Cnvr. Positioning 1 Overtime
The rising operation of the backup base did not end in prescribed time.
-----
422104 Cnvr. Positioning 1 Overtime
The descent operation of the backup base did not end in prescribed time.
-----
422106 Cnvr. Positioning 1 Overtime
The positioning change operation did not end in prescribed time.
Please continue the work after checking the PCB on a conveyor.
422107 Cnvr. Positioning 1 Overtime
The reversal positioning operation did not end in prescribed time.
Please continue the work after checking the PCB on a conveyor.
422201 Cnvr. Positioning 1 PCB Detection
PCB’s were at inlet and outlet of cnvr
.
Please continue the work after checking the PCB on a conveyor.
422202
Cnvr. Positioning 1 PCB Detection
There is no PCB on the conveyer. After the PCB carrying is ended, it can not be
detected.
Please continue the work after checking the PCB on a conveyor.
422203
Cnvr. Positioning 1 PCB Detection
No PCB on the cnvr. After positioning released, PCB could not be detected.
Please continue the work after checking the PCB on a conveyor.
422204
Cnvr. Positioning 1 PCB Detection
The conveyer entrance sensor detected PCB.
Please continue the work after checking the PCB on a conveyor.
0606-009
3.3 Conveyor

3-15
AIVEMT-ID
Erroe ID Error Name, Description, Cause, and Remedy
422301 Cnvr. Positioning 1 Error
The carrying in operation was not able to begin.
-----
422302 Cnvr. Positioning 1 Error
The error was detected while carrying in was operating.
Please continue the work after checking the PCB on a conveyor.
422303 Cnvr. Positioning 1 Error
The exhaust operation was not able to begin.
-----
422304 Cnvr. Positioning 1 Error
The error was detected while exhaust was operating.
Please continue the work after checking the PCB on a conveyor.
422305 Cnvr. Positioning 1 Error
The error was deected while the backup base was rising.
-----
422306 Cnvr. Positioning 1 Error
The error was detected while the backup base was descending.
-----
422307 Cnvr. Positioning 1 Error
Rise operation of a PCB locate stopper is not completed.
Please check a stopper.
422308 Cnvr. Positioning 1 Error
Downward operation of a PCB locate stopper is not completed.
Please check a stopper.
422309 Cnvr. Positioning 1 Error
The positioning change operation was not able to begin.
-----
422310 Cnvr. Positioning 1 Error
The error was detected while the positioning change was operating.
Please continue the work after checking the PCB on a conveyor.
422311 Cnvr. Positioning 1 Error
The reversal positioning operation was not able to begin.
-----
422312 Cnvr. Positioning 1 Error
The error was detected while the reversal positioning was operating.
Please continue the work after checking the PCB on a conveyor.
0606-009
3.3 Conveyor

3-16
AIVEMT-ID
Erroe ID Error Name, Description, Cause, and Remedy
423101 Input Cnvr. PCB Overtime
The PCB transport (carry in) from Cnvr. Positioning1 did not end in prescribed time.
-----
423102 Input Cnvr. PCB Overtime
The PCB transport (exhaust) to Cnvr. Positioning1 did not end in prescribed time.
-----
423103 Input Cnvr. PCB Overtime
The reversal positioning operation did not end in prescribed time.
-----
423201 Input Cnvr. PCB Detection
PCB’s were at inlet and outlet of cnvr.
-----
423202 Input Cnvr. PCB Detection
There is no PCB on the conveyer. After the PCB carrying in ended, it can not able to
be detected.
-----
423203 Input Cnvr. PCB Detection
The conveyer entrance sensor detected PCB
-----
423301 Input Cnvr. Error
The carrying in operation was not able to begin.
-----
423302 Input Cnvr. Error
The error was detected while carrying in was operating.
-----
423303 Input Cnvr. Error
The exhaust operation was not able to begin.
-----
423304 Input Cnvr. Error
The error was detected while exhaust was operating.
-----
423305 Input Cnvr. Error
The reversal positioning operation was not able to begin.
-----
423306 Input Cnvr. Error
The error was detected while the reversal positioning was operating.
-----
0606-009
3.3 Conveyor