00900194-01_SM_ASM ProcessLens_Dual-lane_EN.pdf - 第22页

3 Replacing spare parts 3.1 Optical head 22 Service Manual ASM ProcessLens Dual-lane 09/2018 1. High ring light assembly 2. Dowel pin 3. High ring light board 4. Screws ► Unscrew and remove the six screws (4) that hold …

100%1 / 102
3 Replacing spare parts
3.1 Optical head
Service Manual ASM ProcessLens Dual-lane 09/2018 21
3.1.3 Replacing the high ring light board
Parts
03122924-xx High ring light board
Equipment and tools
Allen key size 1.5
Allen key size 2.5 (T shaped)
Philips screwdriver
Requirements
Machine is switched off.
It is advisable to dismantle the low ring light assembly as well for better access.
Use a T shaped Allen key to carry out this task.
Removal
Unplug the connector
Unscrew the three screws (1) using an Allen key
size 2.5.
 CAUTION!
Small screws
The screws are very small. When the screws fall
into the machine they may damage it.
Make sure the screws don’t fall into the machine.
Make sure no screw is left behind inside the
machine.
.
1. Connector
2. Screw (4 x) and washers (4 x)
Unscrew and remove the four screws (2) using
an Allen key size 1.5.
Remove the four washers.
Separate the high ring light assembly.
 CAUTION!
Ring light assembly
The two parts of the ring light assembly are hold
together by two dowel pins. When separating the
two parts the ring light assembly may get dam-
aged.
To separate the two parts, carefully pull the parts
apart.
.
3 Replacing spare parts
3.1 Optical head
22 Service Manual ASM ProcessLens Dual-lane 09/2018
1. High ring light assembly
2. Dowel pin
3. High ring light board
4. Screws
Unscrew and remove the six screws(4) that hold
the high ring light board(3) in place using a
Philips screwdriver.
Remove the high ring light board(3).
Installation
Follow the removal instructions in reverse order for installation. Also observe the following instruc-
tions.
CAUTION
Do not overtighten the screws
When the high ring light board is reassembled, one must not overtighten the screws, as this
may damage the high ring light board.
3 Replacing spare parts
3.1 Optical head
Service Manual ASM ProcessLens Dual-lane 09/2018 23
3.1.4 Checking the function of the low ring light and the high ring light
Requirements
Machine is switched on.
Machine doors are open.
The low ring light and the high ring light are mounted.
Checking the function
Go to the diagnostic pages and press the control
button(1).
On the Lighting control page click on the light-
ing control button(1).
The Lighting box dialog is displayed.
In the 2D Lighting Setup section(1) push the
slider to the right.
Starting with slider bar M-Ring_G check the
green light of the low ring light.
Check if all LEDs are functional and flashing by
using a mirror or view from underneath the op-
tical head.
Approach the same for all other slider bars in that
section.