00900194-01_SM_ASM ProcessLens_Dual-lane_EN.pdf - 第73页

4 Replacing spare parts at the conveyor 4.5 Conveyor belt, belt drive and hexagonal shaft Service Manual ASM ProcessLens Dual-lane 09/2018 73 Fig.50: Pulling out the pinion gear drive ► From the rear of the rail, push t…

100%1 / 102
4 Replacing spare parts at the conveyor
4.5 Conveyor belt, belt drive and hexagonal shaft
72 Service Manual ASM ProcessLens Dual-lane 09/2018
Removal
CAUTION
Toothed belt
► Make sure that the toothed belt is not folded or otherwise damaged.
► Use the software or manually move the conveyor rail into a position which allows you best
access.
– To move the conveyor rail manually, pull the toothed belt of the width adjustment unit.
– Make sure that the rear side of the conveyor rail is also accessible.
► Switch off the machine, disconnect it from the power supply and secure it to prevent
unauthorized reactivation.
Fig.48: Movable idler pulleys
► Loosen the fixing screw of the relevant movable
idler pulley(1) to release the tension of the belt.
 CAUTION!
Loosen the movable idler pulley only as far
as necessary!
Do not remove the movable idler pulley (unless
you explicitly need to remove it). Otherwise the T
slot nut on the inner side fall into the conveyor
rail.
.
See also Replacing the idler pulley (conveyor belt)
Fig.49: Washer
► Remove the fixing screw(1) (cross head) and
take off the washer(2).
► Remove the toothed belt(3).
► Remove the fastening screw(4) (Allen).
4 Replacing spare parts at the conveyor
4.5 Conveyor belt, belt drive and hexagonal shaft
Service Manual ASM ProcessLens Dual-lane 09/2018 73
Fig.50: Pulling out the pinion gear drive
► From the rear of the rail, push the pinion gear
drive out.
Fig.51: Pulling off the bearing
► Pull the bearing(1) off the pinion gear drive.
Installation
Fig.52: Inserting the bearing
► Insert the bearing(1) into the rail.
Make sure that the bearing does not fall into the
rail.
4 Replacing spare parts at the conveyor
4.5 Conveyor belt, belt drive and hexagonal shaft
74 Service Manual ASM ProcessLens Dual-lane 09/2018
Fig.53: Inserting the pinion gear drive
► Insert the pinion gear drive.
Fig.54: Screw
► Secure the pinion gear drive with the screw(1)
(Allen, DIN EN ISO 7380-M3x4-A2-70
[03074775‑xx]). Tighten the screw with a torque
of 0.58Nm.
 CAUTION!
Make sure that you do not tighten the screw
too much. This could cause irreparable dam-
age to the conveyor!
The corresponding threads are only in 1.5 to
2mm thick plates and could be damaged if you
use a torque which is too high.
For this reason, avoid using screws which are
too short. Use a measuring scale to check, if
needed!
.
Fig.55: Screw
► Thread in the toothed belt(3).
Make sure that the toothed belt is positioned ac-
curately in the guidance on the motor shaft or in
the belt drive.
► Fix the washer(2) with the screw(1) (cross
head).
► When you tighten the idler pulley, set the tension of the toothed belt.
Setting the tension of the conveyor toothed belt