00900194-01_SM_ASM ProcessLens_Dual-lane_EN.pdf - 第67页

4 Replacing spare parts at the conveyor 4.5 Conveyor belt, belt drive and hexagonal shaft Service Manual ASM ProcessLens Dual-lane 09/2018 67 Installation ► Clean the adhesive surfaces on the conveyor rail. Fig.42: Atta…

100%1 / 102
4 Replacing spare parts at the conveyor
4.5 Conveyor belt, belt drive and hexagonal shaft
66 Service Manual ASM ProcessLens Dual-lane 09/2018
4.5.3 Replacing the side sheet metal plates
Parts
Fig.41: Side sheet metal plates
1 Input area 03132184Sxx Side sheet metal plate 7x1x399,25 EB BB RC
2 Placement area 03132182Sxx Side sheet metal plate 7x1x370,5 EB BB RC
3 Output area 03132183Sxx Side sheet metal plate 7x1x205,5 AB RC
Each included in scope
of delivery:
03154789-xx Tape double-sided B = 6 + 1mm
03154790-xx Tape double-sided B = 6 + 1mm, electrically conduct-
ive
Equipment and tools
00326015‑xx Belt tension measuring device
00353832-xx Allen key set
03082092-xx Lint-free cleaning cloths
Ethanol
Isopropanol – IPA can be used as an alternative.
Removal
CAUTION
Do not loosen the wrong screws
Make sure that you do not loosen any other screws except those ones explicitly mentioned.
Loosening other screws could lead to irreparable misalignment or damage to the conveyor.
Use the software or manually move the conveyor rail into a position which allows you best
access.
To move the conveyor rail manually, pull the toothed belt of the width adjustment unit.
Switch off the machine, disconnect it from the power supply and secure it to prevent
unauthorized reactivation.
Remove the relevant toothed belt.
Replacing the toothed belt (conveyor belt)
Pull the old side sheet metal plate off the conveyor rail.
4 Replacing spare parts at the conveyor
4.5 Conveyor belt, belt drive and hexagonal shaft
Service Manual ASM ProcessLens Dual-lane 09/2018 67
Installation
Clean the adhesive surfaces on the conveyor rail.
Fig.42: Attaching the adhesive tapes
Attach the adhesive tapes to the side sheet metal plates as described in the figure. Observe
the following points:
In the input area(1) towards the outside of the machine, electrically conductive adhesive
tape 3M-9469 [03154790-xx] is applied on a 91mm wide stripe.
In the placement area(2), the electrically conductive adhesive tape is not used.
In the output area(3) towards the outside of the machine, a 54mm wide stripe is applied
with electrically conductive adhesive tape 3M-9469 [03154790-xx].
The other surfaces of the sheet metal plates are not applied with electrically conductive
tape 3M-9713 [03154789‑xx]. Make sure to keep the holes for the light barriers free.
4 Replacing spare parts at the conveyor
4.5 Conveyor belt, belt drive and hexagonal shaft
68 Service Manual ASM ProcessLens Dual-lane 09/2018
Fig.43: Input side(1) and output side(2)
Glue the sheet metal plate to the conveyor rail. Observe the following points:
On the input side(1), the side metal sheet plate is attached 1mm towards the inside.
On the output side(2), the side metal sheet plate protrudes the rail by 2mm.
Fit the toothed belt.
Replacing the toothed belt (conveyor belt)