00193891-0702_AI_LP_Barcode_DE+EN.pdf - 第170页
2 PCB barcode scanner assembly instructions SIPLACE 2.7 Installing the PCB barcode scanner 10/2009 Edition 170 : Fix the cables using cabl e ties. 2 : Open the pane l on the left -hand side of the inp ut extension kit. :…

SIPLACE 2 PCB barcode scanner assembly instructions
10/2009 Edition 2.7 Installing the PCB barcode scanner
169
: Connect the grounding cable for the distributor rail to the available grounding point.
The grounding cable must be connected with plai
n washer, snap ring and nut M5.
Grounding
Distributor rail
SIPLACE HS-60
SIPLACE D-series
Distributor rail
Grounding
Run cable
through the gap
2
2
: Fit the cover to the conveyor control.

2 PCB barcode scanner assembly instructions SIPLACE
2.7 Installing the PCB barcode scanner 10/2009 Edition
170
: Fix the cables using cable ties.
2
: Open the panel on the left-hand side of the input extension kit.
: Remove the cover from the conveyor control.
2
Fig. 2.7 - 1 HS-60 / D4 conveyor control
2
Fig. 2.7 - 2 D1/D2 conveyor control

SIPLACE 2 PCB barcode scanner assembly instructions
10/2009 Edition 2.7 Installing the PCB barcode scanner
171
: Connect the cable
Item no.: 03016825-xx for HS-60 / D4 or
Item no. 03016827- xx for D1/D2
for the PCB barcode distributor to the conveyor
control (see also the wiring diagram Section
2.9):
X23
9-pin plug
X24
Power supply (Check the polarization)
Power supply
9-pin plug
2
Fig. 2.7 - 3 HS-60 / D4 conveyor control