Edition 5.0 H24 Head Repair Training Text for Service Engineers
The following manual has been revised and released:
Manual title: H24 Head Repair Training Text for Service Engineers
Manual number (updated edition): 5.0
Manual number (previous edition): 4.0
Date of issue: December 22, 2014
The main changes that have been made are detailed in the table below.
Chapter
Summary of changes
Related
documents
Chapter 1
Revise the contents
None
Chapter 3
Revise the contents
None
Chapter 6
Revise the contents
None
Chapter 7
Revise the contents
None
Chapter 8
Revise the contents
None
Chapter 10
Revise the contents
None
Supplement
1
Change chapter title “Supplement 1 –Proper data
measurement for H24 head using head bench”
None
Supplement
2
Add “Supplement 2 –IPS Camera position adjustment for H24
head using head bench”
None
FK-9F50-08-0E FUJI MACHINE MFG. CO., LTD.
CONFIDENTIAL
Downloaded at 2015/06/18 12:05:48 (JST) by 5LUF0998
(C) FUJI Machine Mfg. Co., Ltd. All Rights Reserved. 2015/06/18 doc3elPkSB8

Edition 5.0 H24 Head Repair Training Text for Service Engineers
MEMO:
FK-9F50-08-0E FUJI MACHINE MFG. CO., LTD.
CONFIDENTIAL
Downloaded at 2015/06/18 12:05:48 (JST) by 5LUF0998
(C) FUJI Machine Mfg. Co., Ltd. All Rights Reserved. 2015/06/18 doc3elPkSB8

Edition 5.0 H24 Head Repair Training Text for Service Engineers
CONTENTS
CONTENTS
Chapter 1 - Replacing the syringes
1.1
Removing the old syringe ........................................................................................... 1-2
1.2
Attaching the new syringe ........................................................................................... 1-5
Chapter 2 - Replacing the Z axis motor
2.1
Remove the Z axis ...................................................................................................... 2-1
2.2
Attaching the Z axis motor .......................................................................................... 2-4
Chapter 3 - Replacing the Z axis ball screw
3.1
Removing the Z-axis ball screw .................................................................................. 3-1
3.2
Attaching the Z-axis ball screw ................................................................................... 3-5
Chapter 4 - Replacing the R-axis motor
4.1 Removing the R-axis motor ....................................................................................... 4-1
4.2
Attaching the R-axis motor .......................................................................................... 4-4
Chapter 5 - Replacing the Q-axis motor
5.1 Removing the Q-axis motor ........................................................................................ 5-1
5.2
Attaching the Q-axis motor ......................................................................................... 5-4
Chapter 6 - Adjusting nozzle lowering lever check sensor and
measuring the air pressure
6.1 Nozzle Lowering Lever Check Sensor ...................................................................... 6-2
6.2 Vacuum Break Pressure Measurement .................................................................... 6-6
6.3 Airflow Measurement ................................................................................................ 6-10
6.4 Nozzle Cleaning Pressure Measurement and air flow measurement ...................... 6-12
6.5 Vacuum Pressure Measurement .............................................................................. 6-12
Chapter 7 - Replacing and Adjusting the Stepping Motor
7.1 Setting up the head I/O check jig .............................................................................. 7-1
7.2 Removing the stepping motor ................................................................................... 7-2
7.3 Setting the step motor origin ..................................................................................... 7-3
7.4 Attaching the stepping motor .................................................................................... 7-6
7.5
Adjusting the stepping motor position .......................................................................... 7-7