c900795.R02_EN.pdf - 第15页
1 Installation 1-1 1 Installation
4 Electrical Section ........................................................................................ 4-1
Signal I/O ............................................................................................................................ 4-2
Signal Input Monitor ................................................................................................. 4-2
Signal Output Control ............................................................................................... 4-4
Serial I/O ................................................................................................................... 4-5
Serial DO Map .......................................................................................................... 4-6
Serial DI Map ......................................................................................................... 4-15
System Box Assembly ...................................................................................................... 4-21
Serial I/O Operation Check LED ............................................................................ 4-22
Vision Operation Check LED ........................................................................................... 4-23
Motion Port Operation Check LED .................................................................................. 4-24
Motion Operation Check LED .......................................................................................... 4-25
Control Board ................................................................................................................... 4-28
Adjustment of Board Detection Sensors ........................................................................... 4-29
Cautions about overall electrical items ............................................................................. 4-31
Computer Virus Prevention and Treatment ...................................................................... 4-32
5 Materials ...................................................................................................... 5-1
Standard Accessories .......................................................................................................... 5-2
Replacement Parts ............................................................................................................... 5-3
Conveyor Belt List .................................................................................................... 5-4
Nozzle 5-5
Air Circuit Diagram .................................................................................................. 5-6

1 Installation
1-1
1
Installation

1 Installation
1-2
Installation of Unit
Environmental Requirements
Install the dispenser at the place where the below conditions are met.
Do not do tasks, such as moving the unit or connecting the unit with the main switch ON to prevent electric
shock.
■ Ambient Temperature: Accuracy assurance 23 +/-2 degrees centigrade
Operation assurance 15 to 35 degrees centigrade
(The average over a period of 24 hours does not exceed 30 degrees C.)
■ Relative Humidity: 20 to 90 percent, non-condensing
■ Altitude: 1,000 or below above sea level
■ Atmosphere: Dust and corrosive gas free
■ Floor: Floor must be flat and sturdy enough for freedom from vibration during
operation.
■ Power Requirements: 200 VAC +/- 10%, three phase, 50/60 Hz
* 208/220/230/240/380/400/415/440V VAC with optional power
transformer
Power consumption: 1.1KW
Installed capacity: 5.5kVA
Leakage current: 20mA or less
* Power and ground the unit independently of other machines which may be a noise
source, such as a compressor, welding machine, or reflow soldering machine with
magnetic contacts.
Warning