3 Mechanical Section 3-20 Filling the screw pump Fill the screw pump with material to make it operational. ■ Procedure Open the "Manual" screen (Manual > Dispense) ① Check the temperature control setting If …

100%1 / 120
3 Mechanical Section
3-19
Installing the DP head on the nozzle holder
Dispense setting
Manual > Dispense
* When installing the DP head, be sure to specify the settings for the installed DP head and syringe.
* If unable to press it all the way to the rear,
slightly shift the screw pump shaft and
hexagon phase.
Install the screw's lock screw.
Use the accessory torque wrench to tighten.
LE6-M5W22-100 /WRENCH,14-5NM
Use the accessory torque wrench to tighten.
LE6-M5W22-100 /WRENCH,14-5NM
Right-click here to select the dispense head type.
Right-click here to select the syringe type.
* If the desired type is not in the library, create a
syringe library.
3 Mechanical Section
3-20
Filling the screw pump
Fill the screw pump with material to make it operational.
Procedure
Open the "Manual" screen (Manual > Dispense)
Check the temperature control setting
If the material requires heating, press the ON button to heat it. (Refer to the syringe library for
temperature settings.)
Electropneumatic output setting
Specify the setting at the setting bar, then press the [Apply] button. (Refer to the syringe library for
pressure settings.)
Checking the eject operation settings
Speed: 10%; Max. Eject Time: 10 minutes
3 Mechanical Section
3-21
Eject Motion [Start (E)]
Press the [Start (E)] button to begin the eject operation. The eject operation stops automatically after 10
minutes or when the [Start (E)] button is pressed again.
NOTE: If the flow of material stops at some point in the tube, or if there is no discharge from the nozzle even after
the 10-minute eject operation, increase the air pressure and perform another eject operation.
NOTE: If no discharge occurs even after the above actions, the nozzle is clogged or the material has hardened. In
this case, clean the nozzle and the pump interior.
Execute the Dot Station Eject program.
Execute as follows: Production Program > Ejecting After Charging.