1 Installation 1-5 Installing the Machine Do not touch terminals of electric com ponents when the power is on to prevent el ectric shock and machine damage. Make sure to ground the machi ne to prevent electric shock. Not…

100%1 / 112
1 Installation
1-4
Production Line
To align your assembly line, first install the heaviest unit. Then install peripheral units using the first unit as
a reference.
Reference
Loader     Mounter     Reflow Oven   Conveyor Unloader
To transfer the PCB (printed circuit board) smoothly, clearance between units are quite important. Be sure
that the clearance between units is 5 mm or less as below figure shows. Adjust the height of the downstream
unit a little lower (0-0.5 mm) so that the PCB is transferred smoothly.
0 - 0.5mm
5mm or less
Downstream Upstream
1 Installation
1-5
Installing the Machine
Do not touch terminals of electric components when the power is on to prevent electric shock and machine
damage.
Make sure to ground the machine to prevent electric shock.
Note on Installation
It is normal that the adjust foot can be slightly inclined (within 2-degree range).
Do not tighten the bolt forcedly trying to fix the foot.
When you move and/or install the mounter, be careful not to apply excessive
force on the adjust foot. This may cause the screw of the adjust foot to break.
When placing the mounter on the floor, be sure that the mounter is kept
horizontal.
Warning
Warning
2°
If excessive force is
applied, the screw may
break at this point.
Mounting Screw
Nut
Adjust foot
1 Installation
1-6
ACTION:
Locate the machine to the specified place.
Remove metal fittings that fasten Head Unit, X and Y Beams, in order to prevent to move during
transportation, and also detach cushions put in the head cable bear. After that, check to see that the X
beams and heads can move to the Y direction manually.
Five ropes can be taken off if five points have been removed.
Note; Please keep the metal fittings, they will be needed when moving the machine.
When the machine is installed stand alone, turn the adjust feet so that the PCB transfer height is the
same as the conveyor height (900±20mm (see Note)) of the reference equipment. In the case of
SMEMA interface spec, the height must be 950±20mm.
When the machine is connected to the Pre-process on production line, adjust the PCB transfer height
to the conveyor rail height of the Pre-process.
)
Production Line
出荷時の内部写真(背面側)
X Y ヘッド
A
C
B
B
A
C