M8_ServiceManual_e.pdf - 第26页

1 Installation 1-12 Put cable clamps on screw holes, and fasten the power cable with cable ties. Power Cable Wiring Route the power cable to outsi de the mounter through the rectangle cabl e at the lower part of the rear…

100%1 / 112
1 Installation
1-11
Jack-up Point
The four Jack-up points are determined considering the structure of M7 base face and balance ratio.
M8
NOTE: The hydraulic jacks must satisfy the following requirements.
Allowable load: 1.5 tons or higher
Hook size: 100mm or more (stroke)
Part Name
Part No. Remark
PLATE,BASE LG0-M8911-00X For plates 1 and 2
Jack-up Point
Prohibited Area for Jack-up
1 Installation
1-12
Put cable clamps on screw holes, and
fasten the power cable with cable ties.
Power Cable Wiring
Route the power cable to outside the mounter through the rectangle cable at the lower part of the rear cover
(see Fig 1 and 2).
In the above picture, circle holes are insertions of power cables and square holes are insertions of tools. At
first, insert a driver to the square hole and press down the driver, insert a power cable to the circle hole, and
pull the driver out, then the cable will be clamped.
The power cable should be secured inside the mounter to prevent accident disconnection by pulling on the
cable outside the mounter.
To fasten the power cable with cable ties, first attach cable clamp to unused screw holes then insert cable
ties through the cable clamps. Or bind the power cable to the terminal-panel leg with cable ties.
Recommended Driver
4mm minus Driver
Recommended Cable
3.5 / Withstand Voltage 600V
Length of peeling off cables
12mm
1 Installation
1-13
Removal of Rust Inhibiting Grease
At packing and shipping, a large amount of grease is applied on the surface of each ball-screw and linear
guides on Y-axis in order to prevent rust. As each axis moves an excess grease is gradually removed from
their surface and a proper amount of grease remains as a lubricant.
For this reason, when these axes are moved at installation, the extra grease may be built up on ball-screw
nuts, on linear guide sliders, and both ends of each axis. If you run the machine at high speed (production)
without wiping it away, the grease may be scattered around due to centrifugal force and vibration, and that
may stick to cameras, sensors, or a board.
Please perform a warm-up at low speed once the origin is acquired after installation, and wipe off any
excess grease as necessary.
The mounter may not function properly when grease sticks to the sensors
and the cameras.
ACTION:
Check and remove any board and tools from inside of the mounter, and then perform origin
acquisition.
Select Main Menu> Manual> Warm Up.
Select Warm-up & Self-diagnostics> Setting.
Select [XY-axes] and set up the parameters as follows.
***** This function is not ready for now. *****
1: Have a check mark on
“Execute Warm-up of XY-axes”.
2: Move the scroll bar and set
“Axis Speed” at 10%.
3: Have a check mark on XY and S
under “Axis”.
4: Have a check mark on
“Entire Area Check“ under “Range”.
NOTE: It is not necessary to have
check marks on the other parameters.