OM-1606 6-46 6. Splicing 1005-001 6.1 1 Splicing Procedure using a Metal Plate Procedure (1) Cut the new tape and tape on the feeder side according to the splicing procedure for each tape width. (2) Set the metal plate o…

OM-1606
6. Splicing
6-450908-001
6.10.5 Precautions
(1) Cut and splice the carrier tape so that there is no overlap of the
carrier tape on the joint position.
Cut off the tape at an angle of 90 degrees to the long side and at the
same position, based on the sprocket hole.
If there is any overlap, the tape might be caught or clogged in the tape
suppressor.
Overlap
(2) When the splicing tape is adhered, set the center of the cut position of
the splicing tape.
If the tape is deviated along the direction of the splicing tape, the tape
spliced section might come off.
Positional Deviation
(3) Do not let the splicing tape swell very far out from the carrier tape.
If there is any swell out, a feed error might occur.

OM-1606
6-46
6. Splicing
1005-001
6.11 Splicing Procedure using a Metal Plate
Procedure
(1) Cut the new tape and tape on the feeder side according to the splicing
procedure for each tape width.
(2) Set the metal plate on the caulking jig.
Metal Plate
Caulking Jig
(3) Set the tape to be spliced on the metal plate.
(4) Caulk the metal plate using the caulking jig. At that time, take care not to
catch your nger between the caulking jig and metal plate.
Status where the metal
plate has been caulked

OM-1606
6. Splicing
6-471005-001
(5) After caulking the metal plate, afx the splicing tape according to the
splicing procedure for each tape width.
•
For the jigs to be used, the jigs made by the following manufacturer are
recommended. Contact the following manufacturer for the purchase of
the jigs.
Component Name Manufacturer
Metal Plate
FUJI CHEMICAL INDUSTRIAL Co., Ltd.
Caulking Jig