OM-1606-006w_GT-28x.pdf - 第150页
OM-1606 6-48 6. Splicing 1005-002 6.12 Conrmation of the No. of Components to be replenished • If the components are replenished with the new carrier tape spliced (1) Press the [Comp. Reload] button in the "Comp. R…

OM-1606
6. Splicing
6-471005-001
(5) After caulking the metal plate, afx the splicing tape according to the
splicing procedure for each tape width.
•
For the jigs to be used, the jigs made by the following manufacturer are
recommended. Contact the following manufacturer for the purchase of
the jigs.
Component Name Manufacturer
Metal Plate
FUJI CHEMICAL INDUSTRIAL Co., Ltd.
Caulking Jig

OM-1606
6-48
6. Splicing
1005-002
6.12 Conrmation of the No. of Components to be replenished
•
If the components are replenished with the new carrier tape spliced
(1) Press the [Comp. Reload] button in the "Comp. Reload" window (See FF5).
Check the No. of remaining components in the Feeder List window to
conrm that the components have been replenished.
•
If the components are replenished with the used carrier tape spliced
(The No. of components is different from the default value)
(1) Press the [Spl Comp Rem] button in the "Comp. Reload" window (See FF5).
The "Cmp Rem" input window will appear.
"Edit Add Cmp" Input Window FF10
(2) Enter the number of replenished components.
Input Range :
1 to 50000000
The values "Fdr Reload" (Component Replenishment Status) will be revised.
When the [AC] button is pressed, if necessary, the remaining number of
components on the selected feeder No. can be zeroed.
(3) Conrm the values in "Fdr Reload" (Component Replenishment Status) and
press the [Set] button to dene these values (status).

OM-1606
7-1
7. Maintenance
0908-001
7. Maintenance
7.1 Precautions before Maintenance
This describes the check, cleaning, and adjustment for tape feeders operating in
good conditions.
A full and periodical maintenance of the tape feeder is recommended.
CAUTION
Only trained persons should perform maintenance,
both carefully and according to the specied
procedures.