APC - 224650 Issue 1.pdf - 第52页
ALL PURPOSE CLAMPING (APC) ADJUSTMENTS AND SETTINGS 1.40 All Purpose Clamping (APC) Manual Chapter Issue 1 Nov 16 14. Use Next or Previous to highlig ht Clamp Pressure . 15. Use Incr . or Decr . to reset to 3 bar . 16. S…

ALL PURPOSE CLAMPING (APC)
ADJUSTMENTS AND SETTINGS
Chapter Issue 1 Nov 16 All Purpose Clamping (APC) Manual 1.39
Mid Plate Down
(Flow Controller 2A)
To set the mid plate down flow controller:
1. Locate flow controller 2A (blue pipe) on the pneumatic loom, found in the
right hand side of the machine where the front and rear pneumatics join
together.
2. In the machine software, select Maintenance.
3. Select Diagnostics.
4. Use Next or Previous to highlight Rail System.
5. Select Select Module.
6. Select Adjust.
7. Use Next or Previous to highlight Clamp Pressure.
8. Use Incr. or Decr. to set to 1.5 bar.
9. Select Exit.
10. Place a board in the print area. Adjust the flow controller so it is fully open
(fully anti-clockwise).
11. While toggling Toggle OTS Over Top Clamp ON and OFF as required:
a. Check that both clamps go all the way down and are flush with the board.
NOTE
It is important to check both clamps simultaneously as they do not always
react the same.
b. If the clamps do not go all the way down this means the balance pressure
was set too high. Reduce the Balance Pressure Regulator slightly
(1/8 turn anti-clockwise) and re-check the clamps go all the way down.
c. Repeat Step 11.b. until the clamps go all the way down.
d. Adjust the flow controller, reducing the air (clockwise), so that the clamps
do not go all the way down.
e. Adjust the flow controller, increasing the air (anti-clockwise), just to the
point where the clamps are down flat again.
f. Adjust the flow controller a further half turn (anti-clockwise). Tighten the
flow controller locknut to prevent accidental adjustment
12. Re-check Mid Plate Balance Pressure Regulator (as detailed earlier in this
Chapter), and verify the clamps still remain in a neutral position.
13. Select Adjust.
2A
Flow Controller
Adjust
Locknut

ALL PURPOSE CLAMPING (APC)
ADJUSTMENTS AND SETTINGS
1.40 All Purpose Clamping (APC) Manual Chapter Issue 1 Nov 16
14. Use Next or Previous to highlight Clamp Pressure.
15. Use Incr. or Decr. to reset to 3 bar.
16. Select Exit.
17. Use Next or Previous to highlight Toggle Board Clamp.
18. While toggling Toggle Board Clamp ON and OFF as required, ensure that
clamp movement is smooth and that both clamps go all the way down to flat.
19. Remove the board from the print area.

ALL PURPOSE CLAMPING (APC)
REPLACEMENT PROCEDURES
Chapter Issue 1 Nov 16 All Purpose Clamping (APC) Manual 1.41
REPLACEMENT PROCEDURES
Qualification of
Personnel
With the exception of board clamp foil replacement, all replacement procedures
in this section should only be completed by an ASM engineer or a suitably
trained customer engineer.
Prepare for
Replacement
To prepare the machine for all of the APC module replacement procedures:
1. Select Open Cover Commands.
2. Select Carriage To Rear.
3. Select Unload Screen.
4. Open the front printhead cover.
5. Remove the screen from the machine.
6. Close the front printhead cover. Press the System button.
7. Select Back.
8. Select Maintenance.
9. Select Diagnostics.
10. Use Next or Previous to highlight Rising Table.
11. Select Select Module.
12. Use Next or Previous to highlight Raise Table To Print Height.
13. Select Run Diagnost.
14. Select Exit.
15. Use Next or Previous to highlight Rail System.
16. Select Select Module.
17. Use Next or Previous to highlight Set Rail Board Width Calibration.
18. Select Adjust.
19. Use Incr. or Decr. to set the Board Width to a suitable maintenance position
(such as 50mm).
20. Select Exit.
21. Use Next or Previous to highlight the following toggle parameters, and use
Run Diagnost to ensure they are set correctly:
a. Toggle OTS Over Top Clamp is set to OFF.
b. Toggle OTS Mid Plate Down is set to OFF.
c. Toggle OTS Mid Plate Up is set to OFF.
d. Toggle OTS Brake is set to OFF.