APC - 224650 Issue 1.pdf - 第92页

ALL PURPOSE CLAMPING (APC) MAINTENANCE SCHEDULE 1.80 All Purpose Clamping (APC) Manual Chapter Issue 1 Nov 16 Clean APC Modules Ensure the APC modules are free from paste and debris: NOTE Cleaning procedures are identica…

100%1 / 112
ALL PURPOSE CLAMPING (APC)
MAINTENANCE SCHEDULE
Chapter Issue 1 Nov 16 All Purpose Clamping (APC) Manual 1.79
Weekly Maintenance
Preparation The machine must be isolated from electrical power and air pressure. Remove
the stencil if fitted.
General
APC System Tick
Clean the APC modules to ensure they are free from paste and debris (see following page).
Check there is no damage to the board clamp foils. If damaged, replace (see following page).
Summary/Remarks
Signed: Date:
ALL PURPOSE CLAMPING (APC)
MAINTENANCE SCHEDULE
1.80 All Purpose Clamping (APC) Manual Chapter Issue 1 Nov 16
Clean APC Modules Ensure the APC modules are free from paste and debris:
NOTE
Cleaning procedures are identical for both modules.
1. Wipe top plates and snug bar face, and ensure free from paste and debris.
2. Slide top plate rearwards, clean internal snug area and ensure free from
paste and debris.
Check Board Clamp
Foils For Wear/
Damage
Check board clamp foils for any signs of wear or damage (bent foils, impact
damage etc).
If worn or damaged, see Board Clamp Foil Replacement in the Replacement
Procedures section of this Chapter.
Tasks
1
Top Plate
Snug Bar Face
2
Snug Bar Internal Face
ALL PURPOSE CLAMPING (APC)
MAINTENANCE SCHEDULE
Chapter Issue 1 Nov 16 All Purpose Clamping (APC) Manual 1.81
Quarterly Maintenance
Quarterly maintenance should only be completed by an ASM engineer or a
suitably trained customer engineer.
Preparation Remove the stencil if fitted.
General
APC System Tick
Check general operation of the APC Modules (see following page).
Summary/Remarks
Signed: Date: