4OM-1733-005w_F8.pdf - 第119页
4OM-1733 1-4-46 1403-004 4.9 PCB Positioning Section 4.9.3 Ball Screw Spline Cleaning and Oiling Cycle : Every 6 Months (Required Time : 10 minutes) Grease : DAPHNE EPONEX GREASE No.1 Grease Nipple Ball Screw Spline (Und…

4OM-1733
1-4-45
4.9.2 Ball Screw Cleaning and Oiling
Cycle : Every 3 Months (Required Time : 10 minutes)
Grease : DAPHNE EPONEX GREASE No.1
Ball Screw
Fig. 4A4-57
Procedure
(1) Wipe old grease out using a rag.
(2) Apply new grease on the screw shaft using a syringe.
Note
Perform the cleaning and oiling operations using the same procedure also in the
system where the Y510mm Single Transfer Unit (Option) has been mounted.
1403-004
4.9 PCB Positioning Section

4OM-1733
1-4-461403-004
4.9 PCB Positioning Section
4.9.3 Ball Screw Spline Cleaning and Oiling
Cycle : Every 6 Months (Required Time : 10 minutes)
Grease : DAPHNE EPONEX GREASE No.1
Grease Nipple
Ball Screw Spline
(Under side of Backup Table)
Fig. 4A4-57-1 Y510 mm Single Transfer Unit (Option)
Note
This optional unit can be selected when the system is delivered from the factory.
Procedure
(1) Wipe out old great using a cloth.
Do not leave any ber on it.
(2) Attach the micro hose onto the hand grease gun and apply new grease from
the grease nipple.
Note
The nozzle to be used should be SPK-3C.
Fig. 4A4-57-2

4OM-1733
1-4-47
4.10 Conveyor Section
Linear Guides (3 locations)
Every 3 Months Cleaning and Lubrication
(DAPHNE EPONEX GREASE No. 1)
Required Time: 5 minutes
Support Pin Detection Sensors (2 locations)
Every Week Cleaning
Required Time: 1 minute
Fig. 4A4-58
1211-002
4.10 Conveyor Section