4OM-1733-005w_F8.pdf - 第119页

4OM-1733 1-4-46 1403-004 4.9 PCB Positioning Section 4.9.3 Ball Screw Spline Cleaning and Oiling Cycle : Every 6 Months (Required Time : 10 minutes) Grease : DAPHNE EPONEX GREASE No.1 Grease Nipple Ball Screw Spline (Und…

100%1 / 153
4OM-1733
1-4-45
4.9.2 Ball Screw Cleaning and Oiling
Cycle : Every 3 Months (Required Time : 10 minutes)
Grease : DAPHNE EPONEX GREASE No.1
Ball Screw
Fig. 4A4-57
Procedure
(1) Wipe old grease out using a rag.
(2) Apply new grease on the screw shaft using a syringe.
Note
Perform the cleaning and oiling operations using the same procedure also in the
system where the Y510mm Single Transfer Unit (Option) has been mounted.
1403-004
4.9 PCB Positioning Section
4OM-1733
1-4-461403-004
4.9 PCB Positioning Section
4.9.3 Ball Screw Spline Cleaning and Oiling
Cycle : Every 6 Months (Required Time : 10 minutes)
Grease : DAPHNE EPONEX GREASE No.1
Grease Nipple
Ball Screw Spline
(Under side of Backup Table)
Fig. 4A4-57-1 Y510 mm Single Transfer Unit (Option)
Note
This optional unit can be selected when the system is delivered from the factory.
Procedure
(1) Wipe out old great using a cloth.
Do not leave any ber on it.
(2) Attach the micro hose onto the hand grease gun and apply new grease from
the grease nipple.
Note
The nozzle to be used should be SPK-3C.
Fig. 4A4-57-2
4OM-1733
1-4-47
4.10 Conveyor Section
Linear Guides (3 locations)
Every 3 Months Cleaning and Lubrication
(DAPHNE EPONEX GREASE No. 1)
Required Time: 5 minutes
Support Pin Detection Sensors (2 locations)
Every Week Cleaning
Required Time: 1 minute
Fig. 4A4-58
1211-002
4.10 Conveyor Section