4OM-1733 1-4-3 4.1.2 Main Air Pressure Check Cycle : Every Day (Required Time : 1 minute) Main Air Pressure Fig. 4A4-3 Procedure Set Air Pressure 0.45 MPa (4.6 kgf/cm 2 ) Check to see that the air pressure is "Min. …

100%1 / 153
4OM-1733
1-4-2
4.1.1 Air Blow Pressure Check
Cycle : Every Day (Required Time : 1 minute)
Air Blowing Pressure
Fig. 4A4-2
Procedure
Check to see that the pressure gauge reads the initial setting (0.05 MPa
(0.5 kgf/cm
2
)). Do not change the pressure unless necessary.
Notice
The pressure is factory-adjusted upon shipment of the machine.
1211-002
4.1 Air Source
4OM-1733
1-4-3
4.1.2 Main Air Pressure Check
Cycle : Every Day (Required Time : 1 minute)
Main Air Pressure
Fig. 4A4-3
Procedure
Set Air Pressure 0.45 MPa (4.6 kgf/cm
2
) Check to see that the air pressure is "Min.
0.4 MPa (4.1 kgf/cm
2
)" while the machine is running.
If not, adjust the air pressure.
1208-001
4.1 Air Source
4OM-1733
1-4-4
4.1.3 Drain Check
Cycle : Every Week (Required Time : 5 minutes)
Cap
Drain
Fig. 4A4-4
Procedure
Prepare a container and pull down the black cap each on the lter case lower
section to drain.
1208-001
4.1 Air Source