Page 10 Vision XP+ V AC 2 M aintenance 2.3 Maintenance Sc hedule Operating Instructions V ersion 1.5 2.3 Maintena nce Sche dule Specified cycles a nd times may var y depending upon throu ghput and the types of mater ials…

Vision XP+ VAC Page 9
2 Maintenance
2.2 Recommendations for the use of chemical clean-
ing agents
Operating Instructions
Version 1.5
Other supplies and materials
• Avia Antifrost C - antifreeze, (corrosion protection for internal coolant wa-
ter circuit)
• Granulate
• various filters
• Felt wheels
The points listed below must be executed before performing any of the tasks
described in these instructions.
1. Switch off the heaters and the conveyor.
2. Before performing any further work, wait until the shutdown routine has
been fully completed!
3. Set the operating mode software-switch to Service.
Attention!
Allow the system to cool down for at least 1 hour before working in the
heating chamber. The door at the front should be opened as well.

Page 10 Vision XP+ VAC
2 Maintenance
2.3 Maintenance Schedule
Operating Instructions
Version 1.5
2.3 Maintenance Schedule
Specified cycles and times may vary depending upon throughput and the
types of materials processed in the system. The specified times are based
upon empirical values for 3-shift operation.
Under certain circumstances, specified maintenance intervals must be
adapted to prevailing conditions by the operator (production volumes, num-
ber of shifts etc.)
2.3.1 Maintenance Schedule Nitro
Note!
To ensure that equipment is gas tight after maintenance or repair work, a
residual oxygen measurement should be made.
Warning!
The temperature should be measured occasionally. The temperature must
be checked and measured again after servicing. .
Sector Maintenance task
(inspection, cleaning
and replacement of
parts if necessary)
Daily
Weekly
Fortnightly
Monthly
Quarterly
Semiannually
Annually
Inspection Time
Maintenance Time
Replacement
Recommend-
ed Parts and
Materials
Process cham-
ber
Interior cleaning x 2 min 30 min Oven
cleaner
Vacuum
cleaner
Cleaning of guide
rails
x 1 min 5 min Oven
cleaner
Inspection of cur-
tains, replacement
if necessary
x 1 min 30 min Oven
cleaner
Chamber seal
cleaning
x 1 min 5 min 1 h appropriate
cleaning
agent

Vision XP+ VAC Page 11
2 Maintenance
2.3 Maintenance Schedule
Operating Instructions
Version 1.5
Cleaning / lubrica-
tion PCB and CBS
spindles at the in-
let and the outlet
as well as the
oven station
x 1 min. 1 h. Oven
cleaner,
Chain oil
Check spindle nut
for „clearance“
+/- ~ 5°
x 1 min.
Nozzle holder
(VXP+)
Clean blocked
holes
Oven cleaner
x 1 min. 5 min Oven
cleaner
Trapped heat
cooler (VXP+)
Remove dust from
cooler
x 1 min. 5 min Vacuum
cleaner
Vacuum cham-
ber
Checking Sensors x 1 min. Sensors
to lubricate trans-
port
x 1 min. 5 min. Lubricant
Spindles, chain,
lifting mechanism
x 1 min. 1 min. Vacuum
grease,
Vacuum
spray,Chai
n oil
Check seal x 1 min.
Vacuum pump Check the fill level x 1 min. 1 min Fomblin
Pump station,
maintenance acc.
to manufacturer
x 1 min. For further information see the
manufacturer´s description
Cooling tract /
Condensate trap
Cleaning of cooler
/agglomerator
x 2 min If neces-
sary
2 min Cooler /
agglomera-
tor
Cleaning of fan im-
pellers
x 1 min If neces-
sary 10
min
10 min Fan Impel-
ler
Replacement of
fine filter as the
need arises
x 2 min 5 min Fine filter
EC gas blower
(VXP, VXP+
VXP+ VAC)
Clean blower, re-
place if necessary
x 5 min. If neces-
sary
10
min.
Blower
Sector Maintenance task
(inspection, cleaning
and replacement of
parts if necessary)
Daily
Weekly
Fortnightly
Monthly
Quarterly
Semiannually
Annually
Inspection Time
Maintenance Time
Replacement
Recommend-
ed Parts and
Materials