ServiceInstruction_Vision XP.pdf - 第57页

Vision XP+ V AC Page 53 2 Maintenance 2.13 Gas take-off point: N2 regul ation Operating Instructions V ersion 1.5 2.13 Gas take -off point : N2 regu lation Fig. 2-8 7 Ga s take-off point Fig. 2-8 8 Cle aning the ga s tak…

100%1 / 142
Page 52 Vision XP+ VAC
2 Maintenance
2.12 Pyrolysis
Operating Instructions
Version 1.5
Fig. 2-83 Removing the Insulation
Fig. 2-84 Loosening the Nuts
Fig. 2-85 Removing the Insulation
Fig. 2-86 Lifting off the Grate
3. Remove the white insulation
which now becomes visible (see
Fig. 2-83). The cover of the py-
rolysis unit becomes visible as
well.
4. Loosen the nuts on the granu-
late container (see
Fig. 2-84) and lift it out along
with the granulate (see
Fig. 2-85). It must be assured
that the nuts and the washers
do not fall into the pipe connec-
tion.
5. Remove the screws which se-
cure the grate and lift the grate
and Gauze Filter off (see Fig. 2-
86).
6. Inspect the granulate for con-
tamination by breaking open
several pellets. If the granulate
is dark colored all the way
through, it has become saturat-
ed and must be replaced.
7. Fill the container with new gran-
ulate under dust-free condi-
tions.
8. Apply copper paste to the
threads. Copper paste is heat-
resistant up to 1000° C.
If the old nuts need are no lon-
ger usable, do not replace them
with stainless steel or zinc plat-
ed nuts.
9. Reinstall the granulate contain-
er by following the above in-
structions in reverse order,
insert the insulation and the
seals (or replace if damaged)
and secure the cover with the
screws.
Vision XP+ VAC Page 53
2 Maintenance
2.13 Gas take-off point: N2 regulation
Operating Instructions
Version 1.5
2.13 Gas take-off point: N2 regulation
Fig. 2-87 Gas take-off point
Fig. 2-88 Cleaning the gas take-off point
Fig. 2-89 Sealing the gas take-off point
The gas take-off point for N2 regula-
tion is located in the peak 2 bottom.
Consumable materials, tools:
Wrench
8 mm metal rod
Teflon tape
Rag
Procedure:
1. Remove the fitting from the
take-off point.
2. Lay the rag over the metal rod
and use it to clean the take-off
point.
3. In order to reseal the gas take-
off point after cleaning, wrap the
thread with Teflon tape and
tighten the fitting with a wrench.
Page 54 Vision XP+ VAC
2 Maintenance
2.14 Residual Oxygen Meter
Operating Instructions
Version 1.5
2.14 Residual Oxygen Meter
The residual oxygen meter are located at the back of the system.
2.14.1 Replacing the Pre-Filter
Fig. 2-90 Unscrew the filter casing
Fig. 2-91 Unscrew the filter insert
Fig. 2-92 Put on the fluorocarbon filter
As well as the activated carbon is
replaced, the fluorocarbon filter has
also to be exchanged.
Procedure:
Unscrew the filter casing and the flu-
orocarbon filter insert.
Put the new fluorocarbon filter insert
onto the element holder and mount
together in reversed order.