ServiceInstruction_Vision XP.pdf - 第18页

Page 14 Vision XP+ V AC 2 M aintenance 2.4 Inlet Operating Instructions V ersion 1.5 2.4 Inlet 2.4.1 Optical fibre sensor at the inlet area Fig. 2-1 Optical fibre sensor a t the inle t Fig. 2-2 Optical fibre sensor a t t…

100%1 / 142
Vision XP+ VAC Page 13
2 Maintenance
2.3 Maintenance Schedule
Operating Instructions
Version 1.5
Tab. 2-1 Maintenance Schedule Nitro
Control cabinets Vacuuming and
cleaning
x 10 min Vacuum
cleaner
Fan covers Vacuuming and
cleaning
x 2 min 5 min Vacuum
cleaner
Complete sys-
tem
Electrical safety
check by safety
specialist
x 2 h
Complete mainte-
nance check by
Rehm Thermal
Systems
x 8 h Due to wear
Sector Maintenance task
(inspection, cleaning
and replacement of
parts if necessary)
Daily
Weekly
Fortnightly
Monthly
Quarterly
Semiannually
Annually
Inspection Time
Maintenance Time
Replacement
Recommend-
ed Parts and
Materials
Page 14 Vision XP+ VAC
2 Maintenance
2.4 Inlet
Operating Instructions
Version 1.5
2.4 Inlet
2.4.1 Optical fibre sensor at the inlet area
Fig. 2-1 Optical fibre sensor at the inlet
Fig. 2-2 Optical fibre sensor at the inlet
The plant has an optical fibre sensor
at its inlet. This optical fibre sensor
is used for PC board identification.
The specified set-point value of this
sensor is between
100 - 250 digits.
Rehm Thermal Systems techni-
cians preset the switching threshold
to 350 digits for a single track and
500 digits for a dual track.
The PC board will be detected when
the threshold level is exceeded.
The degree of soiling is determined
as a percentage. An alarm will in ad-
dition be triggered in the display
should this approach the threshold
level.
To continue proper operation, the
sensor should then be cleaned as
soon as possible, using an appropri-
ate cleaning agent.
The settings are based on Rehm
Thermal Systems experience.
Vision XP+ VAC Page 15
2 Maintenance
2.5 Process chamber
Operating Instructions
Version 1.5
2.5 Process chamber
2.5.1 Cleaning the Interior
Fig. 2-3 Cleaning the Interior
Consumable materials:
Oven cleaner
Rags
Procedure:
1. Raise the process chamber as
far as it will go.
2. Clean the process chamber
floor and side panels with oven
cleaner and a rag.
3. Clean the heater nozzles and
the nozzle sheets in the peak
zone.
4. Remove stubborn incrustations
with the putty knife.