4M184002w_F8S.pdf - 第101页

4OM-1840 1-4-26 1604-001 4.7.1 Nozzle Up/Down Ball Screw (NL-axis) Cleaning and Oiling Cycle : Every 3 Months (Required Time : 10 minutes) Grease : DAPHNE GREASE MP No.1 Nozzle U/D Ball Screw (NL Axis) Fig. 4A4-33 Proced…

100%1 / 315
4OM-1840
1-4-251604-001
NOTICE
When the air-blowing is to be performed to the nozzle,
make sure to start it from the nozzle end section.
If the air-blowing is started from the clamp claw section, the
clamp claw might be damaged.
Vacuum Nozzle
Every 3 Months Inspection
Vacuum Nozzle
Every Week Cleaning
Air Blowing from the Tip
Clamp Claw
Nozzle Filter
Every Week Change
Fig. 4A4-32
Reference
Refer to "5. Vacuum Nozzle Cleaning Procedure" for the vacuum nozzle
cleaning.
4.7 Head Section
4OM-1840
1-4-261604-001
4.7.1 Nozzle Up/Down Ball Screw (NL-axis) Cleaning and Oiling
Cycle : Every 3 Months (Required Time : 10 minutes)
Grease : DAPHNE GREASE MP No.1
Nozzle U/D Ball Screw
(NL Axis)
Fig. 4A4-33
Procedure
(1) Wipe old grease out using a rag.
(2) Apply grease in the ball screw groove slightly using the syringe.
Note
Use No. 19 (brown) nozzle.
No.19
Fig. 4A4-34
4.7 Head Section
4OM-1840
1-4-271604-001
4.7.2 Linear Measure (Light Projector and Receiver) Cleaning
Cycle : Every Day (Required Time : 5 minutes)
Linear Measure Sensor
(Light Emitter)
Linear Measure Sensor
(Light Receiver)
Fig. 4A4-35
Procedure
 
applicator dipped in dehydrated ethanol.
4.7 Head Section