4M184002w_F8S.pdf - 第121页

4OM-1840 1-4-46 1604-001 4.9 PCB Positioning Section 4.9.3 Ball Screw Spline Cleaning and Oiling Cycle : Every 6 Months (Required Time : 10 minutes) Grease : DAPHNE GREASE MP No.1 Grease Nipple Ball Screw Spline (Under s…

100%1 / 315
4OM-1840
1-4-451604-001
4.9.2 Ball Screw Cleaning and Oiling
Cycle : Every 3 Months (Required Time : 10 minutes)
Grease : DAPHNE GREASE MP No.1
Ball Screw
Fig. 4A4-57
Procedure
(1) Wipe old grease out using a rag.
(2) Apply new grease on the screw shaft using a syringe.
Note
Perform the cleaning operation using the same procedure also in the system where the
Y510mm Single Transfer Unit (Factory option) has been mounted.
4.9 PCB Positioning Section
4OM-1840
1-4-461604-001
4.9 PCB Positioning Section
4.9.3 Ball Screw Spline Cleaning and Oiling
Cycle : Every 6 Months (Required Time : 10 minutes)
Grease : DAPHNE GREASE MP No.1
Grease Nipple
Ball Screw Spline
(Under side of Backup Table)
Fig. 4A4-57-1 Y510 mm Single Transfer Unit
Note
Either Y510mm or Y250mm single transfer unit can be selected when the
system is delivered from the factory.
Procedure
(1) Wipe out old great using a cloth.

(2) Attach the micro hose onto the hand grease gun and apply new grease from
the grease nipple.
Note
The nozzle to be used should be SPK-3C.
Fig. 4A4-57-2
4OM-1840
1-4-471604-001
4.10 Conveyor Section
Support Pin Detection Sensors (2 locations)
Every Week Cleaning
Required Time: 1 minute
Linear Guides (3 locations)
Every 3 Months Cleaning and Lubrication
(DAPHNE EPONEX GREASE No. 1)
Required Time: 5 minutes
Fig. 4A4-58
4.10 Conveyor Section