4M184002w_F8S.pdf - 第107页

4OM-1840 1-4-32 1604-001 4.7.7 V acuum Filter Change Cycle : Every 3 Months (Required Time : 30 minutes) Filter Holder Fig. 4A4-43 Procedure   …

100%1 / 315
4OM-1840
1-4-311604-001
4.7.6 Nozzle Change Cam Surface (Upper) Cleaning and Oiling
Cycle : Every 3 Months (Required Time : 5 minutes)
Grease : DAPHNE GREASE MP No.1
Nozzle Change Cam Face
Fig. 4A4-41
Procedure
(1) If a foreign substance adheres to the cam face, remove it with a pair of
tweezers.
(2) Apply grease (0.01 cc) to the upper side of the cam face with a syringe.
Note
(a) "0.01 cc" is almost equivalent to the size of "1005 Chip".
(b) Use No. 19 (brown) nozzle.
No.19
Fig. 4A4-42
4.7 Head Section
4OM-1840
1-4-321604-001
4.7.7 Vacuum Filter Change
Cycle : Every 3 Months (Required Time : 30 minutes)
Filter Holder
Fig. 4A4-43
Procedure
  
removal jig.
 
Filter Holder
Filter
Fig. 4A4-44
NOTICE
Make sure of the lter folder insertion direction, and
then insert the folder securely to the end.
Make sure that the lter folder upper surface is
aligned with the top block upper surface.
4.7 Head Section
4OM-1840
1-4-331604-001
4.7 Head Section
4.7.8 Head U/D Ball Screw (high-speed multi-purpose head) Cleaning and
Oiling
Cycle : Every 3 Months (Required Time : 5 minutes)
Grease : DAPHNE GREASE MP No.1
Head U/D Ball Screw (HL Axis)
Fig. 4A4-44-1
Procedure
(1) Wipe old grease out using a rag.
(2) Apply grease in the ball screw groove slightly using the syringe.
Note
Use No. 19 (brown) nozzle.
No.19
Fig. 4A4-44-2
 
manual axis operation to smooth the grease.