4M184002w_F8S.pdf - 第122页
4OM-1840 1-4-47 1604-001 4.10 Conveyor Section Support Pin Detection Sensors (2 locations) Every Week Cleaning Required Time: 1 minute Linear Guides (3 locations) Every 3 Months Cleaning and Lubrication (DAPHNE EPONEX GR…

4OM-1840
1-4-461604-001
4.9 PCB Positioning Section
4.9.3 Ball Screw Spline Cleaning and Oiling
Cycle : Every 6 Months (Required Time : 10 minutes)
Grease : DAPHNE GREASE MP No.1
Grease Nipple
Ball Screw Spline
(Under side of Backup Table)
Fig. 4A4-57-1 Y510 mm Single Transfer Unit
Note
Either Y510mm or Y250mm single transfer unit can be selected when the
system is delivered from the factory.
Procedure
(1) Wipe out old great using a cloth.
(2) Attach the micro hose onto the hand grease gun and apply new grease from
the grease nipple.
Note
The nozzle to be used should be SPK-3C.
Fig. 4A4-57-2

4OM-1840
1-4-471604-001
4.10 Conveyor Section
Support Pin Detection Sensors (2 locations)
Every Week Cleaning
Required Time: 1 minute
Linear Guides (3 locations)
Every 3 Months Cleaning and Lubrication
(DAPHNE EPONEX GREASE No. 1)
Required Time: 5 minutes
Fig. 4A4-58
4.10 Conveyor Section

4OM-1840
1-4-481604-001
The light receiving section is
located inside these sections
in the figure.
PCB Detection Sensor (8 locations)
Every Week Cleaning
Required Time: 2 minutes
Fig. 4A4-59
4.10 Conveyor Section