00191025-01.pdf - 第373页

9 Maintenance SIPLACE 80S /F/G User’s Manual 9.2 Maintenance Schedules Edition 07/97 from Software Version SR.010.xx 9 - 14 9.2.2 Additional Maintenance for the SIPLACE 80F Plac ement Machine Module Suba ssembly To be ca…

100%1 / 736
SIPLACE 80S/F/G User’s Manual 9 Maintenance
Edition 07/97 from Software Version SR.010.xx 9.2 Maintenance Schedules
9 - 13
Module Subassembly
To be carried out every 2months
(120 / 140 shifts)
Equipment
Date
done
Revolver head Silencer
Blow out, if discolored, replace
Item No. 00320964-01
Compressed air
Tab. 9.2.5 Basic maintenance schedule for the SIPLACE 80S and 80F:To be carried out every 2months (120/140 shifts)
Module Subassembly To be carried out once a year Equipment
Date
done
Tape cutter
Spherical liner
Grease: 0.5 g + 0,25 g per
lubricator nipple
Grease gun,
Urethyn E/M2
Both toothed belts Grease lightly Staburags N12
Tab. 9.2.6 Basic maintenance schedule for the SIPLACE 80S and 80F:To be carried out once a year
Module Subassembly To be carried out as required Equipment
Date
done
Revolver head
Meshing
(screwdriver)
Clean, grease
Ethyl alcohol,
Unimoly GL82
Gear rack
(centering station)
Clean, grease
Ethyl alcohol,
Unimoly GL82
Meshing
(turning station)
Clean, grease
Ethyl alcohol,
Unimoly GL82
dp-station o-ring
Clean, replace, if necessary
Item No.: 00327165S01
Venturi nozzles Clean and replace o-rings Ethyl alcohol
O-rings (Venturi nozzles)
Replace, do maintenance before
installation
Unisilkon L250L,
cloth
Tab. 9.2.7 Basic maintenance schedule for the SIPLACE 80S and 80F:To be carried out once a year
9 Maintenance SIPLACE 80S/F/G User’s Manual
9.2 Maintenance Schedules Edition 07/97 from Software Version SR.010.xx
9 - 14
9.2.2 Additional Maintenance for the SIPLACE 80F Placement Machine
Module Subassembly
To be carried out weekly
(15 / 17 shifts )
Equipment
Date
done
IC head
Friction wheel at the
motor of the d axis
Clean
Ethyl alcohol,
lint-free cloth
O-ring of pick-up star
Clean groove, check and service
sealing ring, if necessary replacing
Ethyl alcohol,
Unisilkon L250L
Tab. 9.2.8 Additional maintenance for the SIPLACE 80F: To be carried out weekly
Module Subassembly
To be carried out every month
(60 / 70 shifts)
Equipment
Date
done
IC head
IC head nozzles,
diaphragm
Apply a small amount of talcum
with a cloth
Talcum,
lint-free cloth
Sleeve Oil sleeve Watchmaker’s oil
Encoder disk Clean Lens cleaning cloth
Friction wheel of
drive unit
Check for contamination
Ethyl alcohol,
lint-free cloth
Cover Check for contamination
Ethyl alcohol,
lint-free cloth
Tab. 9.2.9 Additional maintenance for the SIPLACE 80F: To be carried out every month (60 / 70 shifts)
Module Subassembly
To be carried out every 8 months
(880 / 960 shifts)
Equipment
Date
done
Wafflepack
changer
Recirculating ball screws
linear guides
Clean, grease
(lubrication nipple)
Grease gun
Urethyn E/M2
Tab. 9.2.10 Additional maintenance for the SIPLACE 80F: To be carried out every 8 months (880 / 960 shifts)
Module Subassembly To be carried out as required Equipment
Date
done
IC head
Silencer
Inspect, replace if necessary;
Item No. 00308498-01
Vacuum nozzle
O-rings
Clean, inspect, grease
Ethyl alcohol,
Unisilkon L205L
IC camera
Clean reflective surfaces and
glass disk
Cloth for cleaning
optical equipment
FC camera
Clean reflective surfaces and
glass disk
Cloth for cleaning
optical equipment
Tab. 9.2.11 Additional maintenance for the SIPLACE 80F: To be carried out as required
SIPLACE 80S/F/G User’s Manual 9 Maintenance
Edition 07/97 from Software Version SR.010.xx 9.2 Maintenance Schedules
9 - 15
9.2.3 Additional Maintenance for the SIPLACE G Adh. Application
Machine
Coplanarity
module
Clean glass disk
Cloth for cleaning
optical equipment
Waffle-pack
changer
Guide rails and tray stor-
age unit
Remove abrasion deposits Damp, lint-free cloth
Module Subassembly
To be carried out weekly
(15/17 shifts)
Equipment
Date
done
Mini gantry Guide rails Clean and oil WD40
Tab. 9.2.12 Additional maintenance for the SIPLACE 80G: To be carried out weekly
Module Subassembly
To be carried out weekly
(15/17 shifts) or after 24 hrs. of
installation shut-down
Equipment
Date
done
Adh. applica-
tion head
Aluminum nozzles Clean
Cleaning bolt,
ultra-sonic bath
Tab. 9.2.13 Additional maintenance for the SIPLACE G: To be carried out weekly (15/17 shifts) or after 24 hrs. installation shut-down
Module Subassembly
To be carried out every 2 weeks
(30/34 shifts) or after 48 hrs. of
installation shut-down
Equipment
Date
done
Adh. applica-
tion head
Aluminum nozzles Clean
Cleaning bolt,
ultra-sonic bath
Tab. 9.2.14 Additional maintenance for the SIPLACE 80F: To be carried out every 2 weeks or after 48 hrs. of installation shut-down
Module Subassembly To be carried out as required Equipment
Date
done
Tab. 9.2.11 Additional maintenance for the SIPLACE 80F: To be carried out as required