00198439-03_SIPLACE_JTF-ML2_TX12_V1-V2_DE_EN_CHS.pdf - 第144页

4 Setting up and commissioning 4.2 Retrofitting in the SIPLACE TX-Series 144 User Manual / Bedienungsanleitung / 用户手册 SIPLACE TX V1/V2 Series JEDEC Tray Feeder (JTF-ML2) 11/2019 Fig.91: Wiring the SIPLACE JTF-ML2 at SIP…

100%1 / 278
4 Setting up and commissioning
4.2 Retrofitting in the SIPLACE TX-Series
User Manual / Bedienungsanleitung / 用户手册 SIPLACE TX V1/V2 Series JEDEC Tray Feeder (JTF-ML2) 11/2019 143
Fig.89: Cable routing
Pay attention to the correct running of
the cables [03134469‑xx] and
[03134468‑xx](1) at the conveyor. The
cables have to be in the mounting
bracket(2).
Fig.90: Cable with docked COT
Make sure there is a gap between the
cable and the COT to avoid cable rub-
bing during insertion or removal of
COT.
Run the cables below the conveyor of the SIPLACE JTF‑ML2 towards the back of the COT
insert.
Connect the CAN bus cable [03134468‑xx] to connector X17 at the FCU.
Locate the connectors X1.JTF and X4.COTi1 in the machine base.
Connect the power cable [03134469‑xx] to connectors X1.JTF and X4.COTi1 at the cable har-
ness. If necessary also use adapter cable [03160347‑xx].
4 Setting up and commissioning
4.2 Retrofitting in the SIPLACE TX-Series
144 User Manual / Bedienungsanleitung / 用户手册 SIPLACE TX V1/V2 Series JEDEC Tray Feeder (JTF-ML2) 11/2019
Fig.91: Wiring the SIPLACE JTF-ML2 at SIPLACE TX series V1 – part 1
4 Setting up and commissioning
4.2 Retrofitting in the SIPLACE TX-Series
User Manual / Bedienungsanleitung / 用户手册 SIPLACE TX V1/V2 Series JEDEC Tray Feeder (JTF-ML2) 11/2019 145
Fig.92: Wiring the SIPLACE JTF-ML2 at SIPLACE TX series V1 – part 2