1OM-1086-002.pdf - 第161页

1. Scope A model change operation must be performed through the following steps. Refer to "2. Model Change Operation" for details. • • • • • Preparation for Model Change Operation Step 1 Making a P .C.B. Backup…

100%1 / 355
Section 3
Model Change Operation
0211-005 Chapter 2 3-1 Tg0582-PM-D1
This section describes the procedure of model change
operation for the initial model.
1. Scope
A model change operation must be performed through the following
steps.
Refer to "2. Model Change Operation" for details.
••
••
• Preparation for Model Change Operation
Step 1 Making a P.C.B. Backup Jig or a Holding Jig
Step 2 Preparation for a Screen
Step 3 Creating a Pattern Program
••
••
• Model Change Operation
Step 1 Program Change Operation
Step 2 Product Change Operation
(1) Adjustment of Magnet Support Pins and Attachment of
P.C.B. Backup Jig or Holding Jig
Step 3 P.E.C. Test
Step 4 Dual Camera Automatic Calibration
Step 5 Attachment of Squeegees
Step 6 Attachment of Screen
Step 7 Screen Recognition Test
Step 8 Screen Recognition
Step 9 Settings for Inaccurate Position Correction
Step 10 Solder Paste Supply Operation
Step 11 Paste Kneading Operation
••
••
• Test Printing
Automatic Operation
Step 1 Test Printing
Step 2 Automatic Operation
Fig. 2C1
1. Scope
0211-005 Chapter 2 3-2 Tg0582-PM-D1
2. Model Change Operation
2.1 Preparation for Model Change Operation
Step 1 Making a Backup Jig or a P.C.B. Holding Jig
Refer to "2. Specifications in Section 1" and "1. Specifications
of Backup Plate Making in Section 7" of this chapter and make
a P.C.B. backup jig or a P.C.B. holding jig required for the pro-
duction.
When the magnet support pins are used, it is not nec-
essary to make a P.C.B. backup jig or a P.C.B. holding
jig.
Step 2 Preparation for a Screen
Refer to "2. Specifications in Section 1" of this chapter and make
a screen required for the production.
Step 3 Creating a Pattern Program
Refer to "Section 2 Pattern Program in Chapter 1 of Volume 2"
and create a pattern program for the model to be produced.
2.1 Preparation for Model Change Operation
0211-005 Chapter 2 3-3 Tg0582-PM-D1