1OM-1086-002.pdf - 第173页
Fig. 2C9-1 Step 7 Screen Recognition T est Perform a screen recognition test, using the "Screen Recog. T est" tab sheet. (Operation Sequence: "MAINT ." Window (Main Menu) → "DEVICE TEST" Win…

(13) Set the screen frame in the screen holder and push down
the mechanical valve switch to the right to fix the screen
frame.
Fig. 2C9
The reed switch for the screen frame fixing cylinder is posi-
tioned upon shipment, regarding the thickness of the screen
frame as “30 mm or less”.
When the thickness of the screen frame exceeds “30 mm”,
adjust the position of the reed switch as follows.
Detach the upper cover located on the right rear side, tighten
the setscrew of the reed switch with a precision flat-blade screw-
driver, and adjust the position of the reed switch such that the
LED of the reed switch is turned ON or OFF as follows.
Screen Frame
Fixed Not Fixed
OFF ON
0211-005 Chapter 2 3-13 Tg0582-PM-D1
2.2 Model Change Operation

Fig. 2C9-1
Step 7 Screen Recognition Test
Perform a screen recognition test, using the "Screen Recog.
Test" tab sheet. (Operation Sequence: "MAINT." Window (Main
Menu) → "DEVICE TEST" Window (Submenu) → "Screen
Recog. Test" Tab Sheet)
Refer to "7.2 "Screen Recog. Test" Tab" (Section 6 of
Chapter 2) for details.
0211-005 Chapter 2 3-13-1 Tg0582-PM-D1
Reed Switch Setscrew
Screen Frame Fixing Cylinde
r
Reed Switch
Upper Cover on
Right Rear Side
2.2 Model Change Operation

Step 8 Screen Recognition
A screen recognition must be performed after the screen is at-
tached or detached, power is supplied, the system is cleared, or
the screen coordinates are changed.
Perform a screen recognition, using the "Screen Recog." tab
sheet. (Operation Sequence: "AUTO OPN." Window (Main Menu)
→ "PRODUCT CHG." Window (Submenu) → "Screen Recog."
Tab Sheet)
Refer to "9.7 "Screen Recognition" Tab" (Section 5 of
Chapter 2) for details.
Step 9 Settings for Inaccurate Position Correction
While viewing the inaccurate position between the open areas
of the screen and the P.C.B. patterns with your eyes or the P.E.C.
camera, the inaccurate position can be corrected in the plate
adjustment level before printing.
The amount of correction is fed back to the inaccurate print cor-
rection data of the pattern program data.
Check and adjust the positional deviation between the P.C.B.
and the screen, using the "Inaccurate Posn. Correction" tab
sheet. (Operation Sequence: "MAINT." Window (Main Menu)
→ "TEACHING" Window (Submenu) → "Inaccurate Posn. Cor-
rection" Tab Sheet)
Refer to "6.1 "Inaccurate Posn. Correction" Tab" (Sec-
tion 6 of Chapter 2) for details.
Step 10 Solder Paste Supply Operation
Put solder paste on the screen.
Step 11 Paste Kneading Operation
When solder paste is already kneaded enough, this operation
is not required.
Knead the solder paste on the screen with the squeegees,
using the "Paste Scraping" tab sheet. (Operation Sequence:
"PRODUCT CHG." Window (Submenu) → "Paste Scraping"
Tab Sheet)
Refer to "9.5 "Paste Scraping" Tab" (Section 5 of Chap-
ter 2) for details.
0211-005 Chapter 2 3-14 Tg0582-PM-D1
2.2 Model Change Operation