1OM-1086-002.pdf - 第162页
2. Model Change Operation 2.1 Preparation for Model Change Operation Step 1 Making a Backup Jig or a P .C.B. Holding Jig Refer to "2. Specifications in Section 1" and "1. Specifications of Backup Plate Mak…

1. Scope
A model change operation must be performed through the following
steps.
Refer to "2. Model Change Operation" for details.
••
••
• Preparation for Model Change Operation
Step 1 Making a P.C.B. Backup Jig or a Holding Jig
Step 2 Preparation for a Screen
Step 3 Creating a Pattern Program
••
••
• Model Change Operation
Step 1 Program Change Operation
Step 2 Product Change Operation
(1) Adjustment of Magnet Support Pins and Attachment of
P.C.B. Backup Jig or Holding Jig
Step 3 P.E.C. Test
Step 4 Dual Camera Automatic Calibration
Step 5 Attachment of Squeegees
Step 6 Attachment of Screen
Step 7 Screen Recognition Test
Step 8 Screen Recognition
Step 9 Settings for Inaccurate Position Correction
Step 10 Solder Paste Supply Operation
Step 11 Paste Kneading Operation
••
••
• Test Printing
Automatic Operation
Step 1 Test Printing
Step 2 Automatic Operation
Fig. 2C1
1. Scope
0211-005 Chapter 2 3-2 Tg0582-PM-D1

2. Model Change Operation
2.1 Preparation for Model Change Operation
Step 1 Making a Backup Jig or a P.C.B. Holding Jig
Refer to "2. Specifications in Section 1" and "1. Specifications
of Backup Plate Making in Section 7" of this chapter and make
a P.C.B. backup jig or a P.C.B. holding jig required for the pro-
duction.
When the magnet support pins are used, it is not nec-
essary to make a P.C.B. backup jig or a P.C.B. holding
jig.
Step 2 Preparation for a Screen
Refer to "2. Specifications in Section 1" of this chapter and make
a screen required for the production.
Step 3 Creating a Pattern Program
Refer to "Section 2 Pattern Program in Chapter 1 of Volume 2"
and create a pattern program for the model to be produced.
2.1 Preparation for Model Change Operation
0211-005 Chapter 2 3-3 Tg0582-PM-D1

2.2 Model Change Operation
Step 1 Program Change Operation
Set the current pattern program, using the "PROGRAM
CHANGE" window (submenu).
Refer to "7. "PROGRAM CHANGE" Submenu in Sec-
tion 5" for the detailed information on how to perform
the program change operation.
Step 2 Product Change Operation
Perform the various kinds of product change operations, using
the "PRODUCT CHANGE" window (submenu).
Refer to "9. "PRODUCT CHANGE" Submenu in Sec-
tion 5" for the detailed information on how to perform
the product change operation.
(1) Adjustment of Magnet Support Pins and Attachment of
P.C.B. Backup Jig or Holding Jig
Adjust the position of the magnet support pins and attach
the P.C.B. backup jig or the P.C.B. holding jig prepared for
the model to be produced.
• Using the Magnet Support Pins
Consider the arrangement (balance) and insert them at the
points where they can support the P.C.B. securely during
printing and they should not get in the way of printing.
(a) When the magnet support pins are arranged
out of the P.C.B. position or in an unbalanced
condition, printing may not be performed cor-
rectly.
(b) When the magnet support pins are inserted,
using a template, refer to "3.1 Usage of Tem-
plate" for details.
• Using the P.C.B. Backup and Holding Jigs
Align the P.C.B. backup jig with the holes (dimensional po-
sitions) of the backup table and insert the positioning pins.
0211-005
Chapter 2 3-4 Tg0582-PM-D1
2.2 Model Change Operation