00191369-01.pdf - 第318页

7 What schould you do ... User’s Manual S IPLACE HS-50 7.1 Switching on the SIPLACE line Software Version SR.501.xx Edi tion 01/99 316 NOTE The curren t state of the station is display ed in the status fie ld in the &quo…

100%1 / 442
User’s Manual SIPLACE HS-50 7 What schould you do ...
Software Version SR.501.xx Edition 01/99 7.1 Switching on the SIPLACE line
315
 6ZLWFKLQJRQWKHVW DWL RQVW DUWLQJWKHXVHULQWHUIDFHRIWKHVWDWLRQFRPSXWHU
SURJUDP
ATTENTION
Switch on the station only after the desktop is displayed on the line computer monitor. Otherwise,
communication problems may occur.
Å Switch on the station on the main switch and check to see if the manometer displays the re-
quired operating pressure after you have switched the station on.
The station computer software is uploaded. When the line computer is connected and commu-
nication is error-free, the Main view of the station computer user interface appears for the "Op-
erator" user class after approximately 2 minutes (see Fig. 7.1 - 1
).
7
7 What schould you do ... User’s Manual SIPLACE HS-50
7.1 Switching on the SIPLACE line Software Version SR.501.xx Edition 01/99
316
NOTE
The current state of the station is displayed in the status field in the "State" line, and the action you
are to execute is displayed in the "Action:" line (see Fig. 7.1 - 1).
Å Press one of the start keys (white) when prompted with "Press start key".
(The start keys are located on the input side, output side and on the control panels on the left
and right sides of the station.)
A reference sequence is executed on all axes. The station is ready for operation after the ref-
erence sequence has completed.
The symbol is displayed in the work area of the user interface.
 6ZLWFKLQJRQWKH6,3/$ &(OLQHIORZFKDUW
The following flow chart shows the actions executed be the line computer, station and operator
while the SIPLACE line is being switched on and started up.
User’s Manual SIPLACE HS-50 7 What schould you do ...
Software Version SR.501.xx Edition 01/99 7.1 Switching on the SIPLACE line
317
Test set-up
Reset tracks
No
Line computer tasks
Load cluster data
Fiducials
OK?
Make settings on the machine
Set-up generator appears
Check the set-up
(insert feeder modules)
Switch on
Nozzle check
Change nozzle
configuration, if necessary
Wait for PCB
Introduce PCB
Track
errors
Yes
Abort
placement
Yes
PCB onto output conveyor
No
Station computer
Bold :
Italic :
To be carried out
by the operator
Carried out or
signaled by the
station
Confirm the
set-up generator