00193631-0602.pdf - 第44页
4 Lifting axes Adjustment Instructions MTC 2 4.2 Zero offset, refill position and transfer position 12/2007 Edition 44 W A RNING Before moving the lifti ng axis, ensure that - the cassettes and the WTCs are always fully …

Adjustment Instructions MTC 2 4 Lifting axes
12/2007 Edition 4.2 Zero offset, refill position and transfer position
43
Select "Open WPTC lock".
Manually move the WTC completely out of the cassette onto the rail of the feed axis.
Now the WTC (1) must have contact at the lower third of the ramp of the feed axis (2) (see
figure below).
Select "Close WPTC lock".
Move the WPC back into the cassette so that the WTC interlock is locked.
Click on "Cancel".
Gradually move the lifting axis with or , until the bottom edge of the WTC is
at the level of the rails of the feed axis and you the transition between cassette and rail is
smooth.
NOTE
Every time you press the button or , the lifting axis moves up or down one step
of the selected step size.
Insert the WTC back into the cassette until it engages in the WTC interlock.
Close the window with "Accept".
Repeat this calibration procedure for the other cassettes.
1
2

4 Lifting axes Adjustment Instructions MTC 2
4.2 Zero offset, refill position and transfer position 12/2007 Edition
44
WARNING
Before moving the lifting axis, ensure that
- the cassettes and the WTCs are always fully inserted in the tower,
- the driver is disengaged and
- the WTC interlock is locked.

Adjustment Instructions MTC 2 4 Lifting axes
12/2007 Edition 4.3 End positions
45
4.3 End positions
NOTE
When the end positions are calibrated, the value determined is automatically saved.
4.3.1 Preparatory measures
NOTE
The zero offset must be checked before the end positions are checked and calibrated.
Check the zero offset of the lifting axis (see section 4.2.2 "Checking the zero offset").