ATTENTION
Before you switch off the line, ALWAYS make sure that:
All placement operations on the stations are completed.
The z-axis of all placement heads are in the top end position.
None of the placement heads still contain components.
All gantries have moved into the standby position.
The station computers have been properly shut down.
7.2.1 Switching off the line computer
CAUTION
NEVER just switch off the line computer on the power switch (of the UPS).
ALWAYS shut down the operating system of the line computer with "Shutdown". Otherwise you
will almost certainly lose a lot of data and may need to reinstall the line computer software.
Å Position the mouse at the right or lower edge of the screen.
The cursor will change into a cross.
Å Press and hold down the left mouse button. The main menu appears.
Å Move the mouse cursor onto the Shutdown menu item and then release the mouse button.
The following dialog box appears on screen:
Å Click on yes. The dialog box closes and the operating system shuts down. This operation takes
around 1 minute. The following then appears:
Å Switch off the UPS.
really shutdown?
yes no
** Safe to Power Off **
-or-
** Press Any Key to Reboot **
SIPLACE 80S-20/F4 User Manual 7 What should you do ...
Software version SR.407.xx 01/2001 US Edition 7.2 Switching off the SIPLACE line
371
7.2.2 Switching off the stations
ATTENTION
NEVER switch off the station during operation using just the main switch except in an emergency.
Shut down the operating system of the station with "Shut down computer..." before you switch off
the station. If you switch off the station during operation without properly shutting down the oper-
ating system beforehand, then the station computer may not start up the next time the station is
switched on. 7
7
Proceed as follows to switch off the station: 7
Å Terminate all placement operations.
Å Check to make sure that the z-axes of all placement heads are in the upper end position.
Å Check to see if there are still components in the placement heads and remove any components
found.
Å If necessary, move all gantries to the standby position with the help of the corresponding gantry
functions (see chapter 5
, section 5.2.3.1).
NOTE
All gantries are normally moved to the standby position automatically. 7
Å Click on the menu function Shut down computer... in the Mode menu.
All station computer processes are terminated. After the operating system has shut down, a
message will appear on the screen stating that the computer can now be switched off.
Å Now switch off the station on the main switch.
7 What should you do ... SIPLACE 80S-20/F4 User Manual
7.2 Switching off the SIPLACE line Software version SR.407.xx 01/2001 US Edition
372
7.2.3 Starting stations that remain switched on after the line computer has been
shut down
If stations remain switched on after the line computer has been shut down and the line computer
is then restarted, the computer will not automatically establish connections with those stations.
The following error messages may appear on the line computer monitor: 7
No correct connection between line computer and station
The line computer was shut down and restarted, so the station must also be shut down and
restarted.
7
There are two ways of re-establishing the connection between the line computer and station after
the line computer has been shut down: 7
1st option 7
Å Disable the conveyor interface at the stations from the Machine options menu.
Å Run all the PCB feeders on the line until they are empty.
Å Switch the stations off and on again.
The stations will establish connections with the line computer.
Å Press the Start button when prompted. The reference point run will then be carried out.
Å Continue placement.
2nd option 7
Å Select the Line engineer access level (password required) from the Options menu.
Å Select the Stand-alone option from the Operating mode menu.
The PCB conveyor for the station will run on until empty.
Å Wait until you are prompted to press the Start button.
Å Select Line computer from the Operating mode option in the Options menu.
The station will automatically establish a connection with the line computer.
Å Press the Start button.
The reference point run will then be carried out.
Å Set the access level back to Operator.
Å Continue placement.