DECAN_S2_Admin(Eng_Ver4.5).pdf - 第478页

15-27 System Setup

100%1 / 609
15-26
Advanced Chip Shooter DECAN S2 Administrator’s Guide
6. Click the <OK> button in the following order to remove all nozzles installed on the
head. Then insert the nozzle for the fly camera test into the No. 1 hole of the ANC.
Caution If the acrylic door is open, it affects the lighting during light
mapping. Therefore, close the acrylic door before
performing light mapping.
7. Once the <Prepare Test / Mapping> is completed, click the <Start> button in the
<<Mapping>> group to perform light mapping.
15-27
System Setup
15-28
Advanced Chip Shooter DECAN S2 Administrator’s Guide
8. Once the light mapping of Fly1~Fly6 is completed, the following dialog box is
displayed. clicking the <OK> button will display the dialog box for testing.
9. Click the <(Y)> button to perform the test automatically.
10. If the dialog box saying that the light mapping test has been completed is displayed,
click the <OK> button. Then click the <Close> button to close the mapping test dialog
box.