OM-1012-001.pdf - 第66页
Chapter 1 Basic description about the device is explained. Specifications Structure Scope of Actions Preparation and Checks required before Automatic Opera- tion Procedure of Automatic Operation from the beginning to the…

Tg0869-PM-OM
8.3 [Elevator Middle Stage Cover Limit] Switch
For as long as the elevator middle stage cover is removed, the load
power supply is stopped.
0305-001 64
Switch Name Symbol Countermeasures
[Elevator Middle Stage Cover
Limit] Switch
• For as long as the elevator middle stage cover is re-
moved, the load power supply is stopped.
-SQ503
8.3 [Elevator Middle Stage Cover Limit] Switch
[Elevator Middle Stage Cover
Limit] Switch (SQ503)
[Elevator Middle Stage Cover
Limit] Switch (SQ503)

Chapter 1
Basic description about the device is explained.
Specifications
Structure
Scope of Actions
Preparation and Checks required before Automatic Opera-
tion
Procedure of Automatic Operation from the beginning to the
end
Operation
0305-001 Chapter 1 1 Tg0869-PM-OM

0305-001 Chapter 1 2 Tg0869-PM-OM