4OM-1429-008_w.pdf - 第102页

1-42 PCB Detection Sensors (14 places) Every W eek Cleaning Required T ime: 2 minutes Clean the PCB detection sensors with a rag. Support Pin Detection Sensors (8 places) Every W eek Cleaning Required T ime: 1 minute Cle…

100%1 / 279
1-41
3.3.10 Conveyor Section
Conveyor Belt Shafts (5 places)
Every 3 Months Cleaning and Lubrication
(MOLYNOC GREASE AP1)
Required Time: 5 minutes
Wipe off the old grease with a rag and apply
new one with a brush.
Take ample care not to leave
any waste threads after cleaning.
Notice
Linear Guides (8 places)
Every 3 Months Cleaning and Lubrication
(DAPHNE EPONEX GREASE No. 1)
Required Time: 5 minutes
Wipe off old grease with a rag and apply
new one with a syringe.
Take ample care not to leave any
waste threads after cleaning.
Grease should be applied every 3 months
after the initial month.
Use No. 19 (brown) nozzle.
Notice
Note
No. 19
Fig. 4A31
3.3 Inspection, Cleaning, and Lubrication Spots
0707-001
1-42
PCB Detection Sensors (14 places)
Every Week Cleaning
Required Time: 2 minutes
Clean the PCB detection sensors with a
rag.
Support Pin Detection Sensors (8 places)
Every Week Cleaning
Required Time: 1 minute
Clean the support pin detection sensors with
a rag.
Fig. 4A32
3.3 Inspection, Cleaning, and Lubrication Spots
0707-001
1-43
3.3.11 Nozzle Stocker Section
Nozzle Storage Section
Every Month Cleaning
Suck dirt and dust wit
h a vacuum cleaner.
Nozzle Stocker Sliding Area
Every 3 Months Cleaning and Lubrication
(DAPHNE EPONEX GREASE No. 1)
Required Time: 5 minutes
(1) Wipe off old grease with an oiled rag.
(2) Apply new grease wit
h a
syringe.
Use No. 19 (brown) nozzle.
Note
No. 19
Fig. 4A33
3.3 Inspection, Cleaning, and Lubrication Spots
0707-001