Vermes MDS 358X user Manual.pdf - 第57页

Init ial Operation 46 VTK - TR -BA- 072e - 1 - User Manua l MDS 358X S eries Step 2 (O - ring) In case that you re ce ive d t he O - rin g separately , you have t o mount it ont o the f luid box b ody. Pull th e O- ring …

100%1 / 195
Initial Operation
VTK-TR-BA-072e-1 - User Manual MDS 358X Series
45
Options Recommended options
Different models of fluid boxes
Different fluid box connectors
Nozzle heating
Cleaning set
MDT 301 - Universal Tool
MDT 306 - Torque Wrench Tool
MDT 324 - Nozzle Insert Cleaning Holder
If the intended application needs particular accessories (e.g. seals made of special material),
consult our Technical Support at once (see Page 7). Do not start the system in incomplete state.
6.2 First Assembling of the Valve
This chapter describes how to ready your microdispensing system for the first dispensing session.
Always make sure all screw couplings sit tight (torque values in paragraph 3.3.11, page 19).
INFORMATION
Some parts preassembled
Some elements of the equipment are usually delivered in preassembled state. In those cases you
can omit the respective steps.
Proceed as follows:
Picture Explanation
Step 1 (fluid box body)
Information!
This step will be optional, if you re-assemble the valve
later, since usually you would not remove the
Connector BY from the mounting body.
Place the fluid box body on the receptacle of the
mounting body. Align the bore on the fluid box body
with the bore on the mounting body (see circles in
the first picture). The fluid box body will sit in the
mounting body.
Push the Connector BY through the mounting body
into the bore of the fluid box body. Screw the
Connector BY tight (clockwise) by using an MDT 327
(for newer revisions of the Connector BY you can also
use a hexagon key 2.5 or the MDT 306 - Torque
Wrench Tool VM with the Bit Hexagon Key 2.5).
Torques are depending on the material of the
mounting body (stainless steel 90 100 cN.m, PEEK 70
80 cN.m).
Important Note!
Do not press the fluid box body while fastening the
Connector BY. Otherwise, the Connector BY cannot
correctly grip into the fluid box body.
Initial Operation
46
VTK-TR-BA-072e-1 - User Manual MDS 358X Series
Step 2 (O-ring)
In case that you received the O-ring separately, you
have to mount it onto the fluid box body.
Pull the O-ring over the fluid box body with a pair of
tweezers. Be careful not to damage the O-ring.
Step 3 (tappet sealing)
Use MDT 328 - Tappet Sealing Changing Tool to press
the Tappet Sealing PE/PTFE/HT into the fluid box
body until it sits tight.
Step 4 (tappet centering piece)
Press the tappet centering piece into the fluid box
body. Use the wide end of the MDT 323 - Nozzle Insert
- Squeezing Out Tool TA. Make sure the tappet
centering piece rests flat.
Important note!
You do not need a tappet centering piece, if you use a
2G tappet rod.
Step 5 (tappet and tappet centering screw)
Screw the Tappet Centering Screw BY into the fluid
box. Do not screw it tight yet. Screw it only for two
rotations.
Important note!
Before mounting, please place a small droplet of
Tappet Grease TF (Order no. 1014637; droplet size ca.
2 mm) on the tappet and another on the tappet
spring (for placing see blue arrows in the picture).
Make sure that the tappet tip is free of grease. Rotate
the tappet and pull it in and out for three times to
spread the grease.
Place the tappet spring over the Tappet Centering
Screw BY.
Push the tappet rod through the tappet spring into
the Tappet Centering Screw BY. Make sure the tappet
goes through the tappet sealing.
Initial Operation
VTK-TR-BA-072e-1 - User Manual MDS 358X Series
47
Screw the Tappet Centering Screw BY completely into
the fluid box (torque 100 140 cN.m) with MDT 303 -
Nozzle Insert Changing Tool.
Make sure the three pins of the MDT 303 fit exactly
into the three holes of the Tappet Centering Screw
BY. Turn the MDT 303 clockwise while pressing it
down slightly to the fluid box.
Combine the MDT 303 with MDT 327 for a better
leverage.
Step 6 (nozzle insert)
Clip the nozzle insert into the fluid box. Use the small
hole of MDT 327 - Multi-Function Tool to pick up the
nozzle insert and to place it. Make sure the nozzle
insert sits flat.
Step 7 (nozzle fixation nut)
Screw the nozzle fixation nut clockwise onto the fluid
box. Use MDT 327 Multi-Function Tool.
Step 8 (cartridge base)
Place the cartridge base onto the fluid box and fix it
with the tightening screw. Screw the tightening screw
clockwise with MDT 327 Multi-Function Tool (torque
120 140 cN.m).
Important note!
In case you use a Cartridge Base without integrated
luer lock, you need to screw the Fluid Box Connector
Luer Lock into the top bore of the cartridge base CH.
Use the open-ended wrench of the MDT 327
(hexagon screw size M8, torque stainless steel 100
120 cN.m, PEEK 40 60 cN.m).
Optional (isolation body)
For thermally sensitive applications, you might use an
isolation body. Pull it onto the fluid box, until it clips
in. Screw it tight with the two screws for the isolation
body (torque 40 50 cN.m). Use the MDT 329 - L-
Shape hexagon Key 2 mm.
Step 9 (adjust screw)
Open the adjust screw completely. Screw counter-
clockwise. Use MDT 327 Multi-Function Tool.