2500_Users_Manual.pdf - 第45页
Insta llatio n and Se tup 2-2 ProMa ster 25 00 U ser Ma nual Before You Install Before yo u inst all the Pr oMaster 25 00, confi rm that yo u have the following i tems ready in the area where it will be op erating: • Roo…

ProMaster 2500 User Manual 2-1
2
Installation and Setup
For Administrators
This chapter describes how to install and start the ProMaster 2500 and is
directed to system administrators. You should be familiar with the
information described in Chapter 1 before performing the operations
described in this chapter. System operators should skip Chapters 2 and 3
and read the daily operating procedures described in Chapter 4.
The procedures in this chapter include connecting the RS-232C cables,
connecting the external air line, installing and starting TaskLink,
installing the periodic system disk updates, and confirming that the
system is communicating and that no errors were detected during the
powerup self-test.
The information in this chapter is organized as follows:
Before You Install ....................................................................................2-2
Unpacking and Inspecting the 2500......................................................2-2
Installing the 2500....................................................................................2-4
Connecting the PC and Installing TaskLink......................................2-16
Turning on the 2500...............................................................................2-18
Adjusting Print Quality and Position.................................................2-22
Updating the 2500..................................................................................2-29

Installation and Setup
2-2 ProMaster 2500 User Manual
Before You Install
Before you install the ProMaster 2500, confirm that you have the
following items ready in the area where it will be operating:
• Room temperature between 50 and 100 degrees F (10 and 38
degrees C).
• Clean, dry, oil-free factory air supply capable of supplying a constant
volume of 1.0 CFM (cubic feet/minute) at 80 PSI (pounds/square
inch) (5.5 Bar at 0.0283 CMM).
• Air filter (rated at 10 microns) and regulator located between your
compressor and the 2500.
• An air line from your filter/regulator with either a female quick
connect or female 1/4-inch NPT adapter to connect to the air line
supplied with the 2500. The 1/4-inch line provided with the system is
approximately 6 feet long. To prevent condensation in the lines, their
combined length should not exceed 10 feet.
Unpacking and Inspecting the 2500
This section describes how to remove the 2500 from its shipping crate and
lists the components that are shipped with the 2500. Follow the steps
below to remove the 2500 from its wooden shipping crate.
Note: Examine the wooden shipping crate for signs of damage before you begin
to unpack the 2500. Two indicators are attached to the outside of the
shipping crate: the drop indicator tells you if the crate was dropped, and
the tilt indicator tells you if the crate was placed on its side. If either is
positive, or if the crate is damaged in any way, contact your shipping
agent and Data I/O Customer Support (refer to the Preface).
Figure 2-1
Connecting the Air Line from the External Source to the 2500
INPUT AIR
LINE (6 ft.)
ADAPTER
MALE QUICK CONNECT
(With female 1/4 NPT)
FEMALE QUICK CONNECT
(Knurled Sleeve)
SOURCE AIR
LINE (4 ft. max)
FILTER/REGULATOR
TO EXTERNAL
AIR SOURCE
10 FT MAX
SUPPLIED BY CUSTOMER DELIVERED WITH PROMASTER
1761-1
2500

Installation and Setup
ProMaster 2500 User Manual 2-3
1. Remove the eight screws (two on each vertical panel) that hold
together the panels of the shipping crate (see Figure 2-2).
2. Carefully lift the top of the shipping crate and pull up the four
vertical panels, and set them aside.
3. Carefully lift the 2500 (this will require two strong people) and set it
on a clean, sturdy, stable surface.
CAUTION: When removed from its shipping crate, the 2500 weighs 160
lb (72.75 kg). It will be difficult to lift and must be placed on
a surface that can support it.
When you unpack your system, confirm that you have received all the
components required to operate the system. Your ProMaster 2500 system
includes the following items:
• ProMaster 2500 handler
• 3.5 inch disks:
TaskLink
program disk,
Boot Files
disk,
Algorithm/
System
disk(s), and
Device List
disk
•Programming module
• Two RS-232C cables with male and female DB25 connectors
• One 9- to 25-pin adapter cable
Figure 2-2
The 2500 Shipping Crate
2306-1
FRONT
REAR
TOP
PALET