SME_Jig_User_Guide(Eng_Ver1).pdf - 第92页
在线预览 SME_Jig_User_Guide(Eng_Ver1).pdf PDF 文档。

5-15
Maintenance
5. Align fuse holders in the fuse holder groove and install the fuse holder by pressing it
with a hand.

6-1
TroubleShooting
Chapter6. TroubleShooting
6.1. Problems and Measures
Describes problems that may occur when using a calibration jig for an SME feeder and
measures against them.
Problem Possible Cause Measures
Power is
not turned
on.
The power switch of the calibration
jig is turned off.
Turn on the power switch of
the calibration jig.
The switch of the multi-tab
supplying power to the calibration
jig is turned off.
Turn on the multi-tab switch.
The 220V power cable is defective. Replace the 220V power
cable.
The SMP is defective. Contact our C/S and replace
the SMP.
When the power supply fuse of the
calibration jig is cut off
Replace the power supply
fuse.
Communic
ation is not
available.
Communication is disconnected
due to a problem with the software.
Exit and restart the calibration
jig program.
Defective contact of the USB25PIN
cable.
Replace the USB25PIN cable.
While running the calibration jig
program in the PC, conflict of
programs occurred.
Exit and restart the calibration
jig program.
Reboot the PC.
If the problem is not solved,
reinstall the calibration jig
program.
A problem occurred to the wiring
from the CAN board to the
USB2USB holder.
Contact our designated C/S
(STS) or our overseas agent
and replace the wiring.
A problem occurred to the CAN
board.
Contact our designated C/S
(STS) or our overseas agent
and replace the CAN board.