1.3 Maintenance Spots
1.3.1 General View
Refer to "1.3.2" and after for details.
Fig. 4A5 Top View of Machine
1.3 Maintenance Spots
0412-003 1-8 AIL01ETRP
• Before performing maintenance work, turn off the
power and air sources and lock the power breaker
using the padlock.
• Designate a person who can have charge of the
padlock key.
• The cover of the machine must be detached for the
maintenance work.
After the maintenance work, be sure to attach the
cover.
(7) X/Y Table Section
(20) Placement Height
Correction Section
(22) Tape Feed Unit Section
(18) Pick-Up Height
Correction Section
(13) Feeder Carriage
Section
(2) Vacuum System
(3) Dust Collector and
Waste Tape Box
(5) Intermediate Base
(26) Filters and
Fans in Each
Section
(17) P.C.B. Transfer Section
(27) L/R Conveyor
Sections
(8) Light Source Device for
Component Recognition
(28) Exhaust Cleaner
WARNING

1.3 Maintenance Spots
0305-001 1-9 AIL01ETRP
(15) Nozzle Change
Section
(14) Placement Change
Correction Section
(21) Placement
Up/Down Section
(11) Main Body
Driving Section
(9) Head Section
(5) Component
Receiving Box
(1) Air Source
(TCM-X300S)
(24) Head Up//Down Section
(25) Control Box
Section
(4) Component
Recognition Section
(23) Nozzle Guide Section
Fig. 4A6 Front View of Machine
Fig. 4A7 Rear View of Machine
(19) Pick-Up Up/Down
Section
(16) Nozzle Change/Return
Section
(12) Cutter Section
(1) Air Source
(TCM-X110J)
(10) Linear Measure
Detection Section
(6) Component Drop Prevantion Cover

1.3.2 Understanding of Maintenance Items on Each Section
Clarified in this session are each individual spots of the machine to be
maintained.
Refer to "1.5 Maintenance Check List" for periodic maintenance.
View of Inspection, Cleaning, and Lubrication Spots
(Example of Identification)
Fig. 4A9
*1: Maintenance Spot
*2: Cycle and Contents of Maintenance
*3: Details of Maintenance
*4: Maintenance Spot No.
These are used in "1.5 Maintenance Check List".
Display 1D2
Number (0, 1, 2 …)
Cycle of Maintenance
1D: Every Day
1W:Every Week
1M: Every Month
3M: Every 3 Months
6M: Every 6 Months
1Y: Every Year
2
2
Main Air Pressure 1D2
Daily Inspection
Set Air Pressure 0.5 MPa (5.1 Kgf/cm )
Confirm that the air pressure is "Min. 0.4 MPa
(4.1 Kgf/cm )" while the machine is running.
If not, adjust the air pressure.
*1
*2
*3
*4
1.3 Maintenance Spots
0407-002 1-10 AIL01ETRP