TRANSPORT ATION MAJOR RE LOCATION 34.38 Technical Reference Manual Chapter Issue 7 Oct 06 2. Disconnect the fol lowing fr om the lef t han d auxili ary conv eyor: • M27PL07 from M27SK07 on the rear rail • M27PL06 from M2…

100%1 / 120
TRANSPORTATION
MAJOR RELOCATION
Chapter Issue 7 Oct 06 Technical Reference Manual 34.37
Removing the High
Throughput
Conveyor (HTC)
The high throughput conveyors (HTC) auxiliary conveyors must be removed
prior to transportation.
To remove the auxiliary conveyors, remove the left and right safety covers and
the following panels (as detailed in the Covers chapter):
• Gull wing covers - front and rear side covers on both sides
• Sliding glass covers - front and rear corner panels and the centre side
panel on both sides
1. Disconnect the following from the right hand auxiliary conveyor:
• M27PL17 from M27SK17 on the rear rail
• M27PL16 from M27SK16 on the front rail
• M27PL14 from M27SK14 on the front rail and unclip M27SK14 from its
bracket
• Electrical connection from M27SOL01 (pneumatic solenoid) on the front
rail
• Electrical connection from M27SOL03 (pneumatic solenoid) on the front
rail
• Pneumatic feed from the input connector of M27SOL03
• 8SK21 from 8PL21 and 8SK23 from 8PL23 of the belt speed motor
controllers
• M27SK24 from M27PL24 and M27SK25 from M27PL25 of the belt speed
motor controllers. Cut the two cable ties.
NOTE
Some cable ties need cutting to separate cables that are attached to the
auxiliary rail and those that stay in the machine.
TRANSPORTATION
MAJOR RELOCATION
34.38 Technical Reference Manual Chapter Issue 7 Oct 06
2. Disconnect the following from the left hand auxiliary conveyor:
• M27PL07 from M27SK07 on the rear rail
• M27PL06 from M27SK06 on the front rail
• M27PL05 from M27SK05 on the front rail and unclip M27SK05 from its
bracket
• Electrical connection from M27SOL02 (pneumatic solenoid) on the front
rail
• Pneumatic feed from the input connector of M27SOL02
NOTE
Some cable ties need cutting to separate cables that are attached to the
auxiliary rail and those that stay in the machine.
3. Whilst supporting the right hand auxiliary conveyor, remove the two bolts
that secure the auxiliary conveyor mounting bracket to the machine frame.
4. Whilst supporting the left hand auxiliary conveyor, remove the two bolts that
secure the auxiliary conveyor mounting bracket to the machine frame.
5. Place the bolts back into the holes in the machine frame and tighten to
prevent loss during transportation.
6. Fit the side covers and panels that were previously removed.
Auxiliary Conveyor Securing Bolts
Auxiliary Conveyor
Mounting Bracket
Machine Frame
TRANSPORTATION
MAJOR RELOCATION
Chapter Issue 7 Oct 06 Technical Reference Manual 34.39
Removal of ProFlow 1. Disconnect both curly air lines from the self-seal pneumatic connectors
situated either side of the ProFlow printhead mechanism.
2. Disconnect the three ProFlow mechanism connectors from the print car-
riage, left hand side:
• ProFlow Motor
• Home Sensor
• ProFlow Paste Level Sensor (if Time to Go is enabled, an amplifier is
connected to 9PL61 and the connection is made to 9PL62 on the ampli-
fier).
3. Manually raise the ProFlow pressure mechanism by pulling the latch on the
front of the unit and lifting the mechanism to the fixed raised position.
4. Open the locking clip securing the transfer head to the pressure mechanism
and carefully slide the transfer head out and away from the pressure
mechanism as indicated in the figure below.
Pneumatic Connectors
ProFlow Motor
(9SK17)
Home Sensor
(9SK08)
ProFlow Paste Level
Sensor (9PL61)