Printer 710_810 v8 Transportation.pdf - 第92页

TRANSPORT ATION MAJOR RE LOCATION 34.92 Technical Reference Manual Chapter Issue 7 Oct 06 8. Connect the 4mm tubi ng from the external sol vent ta nk to the solvent fluid connector on the ext ernal ser vices panel . 9. C…

100%1 / 120
TRANSPORTATION
MAJOR RELOCATION
Chapter Issue 7 Oct 06 Technical Reference Manual 34.91
6. Connect both curly air lines to the self-seal pneumatic connectors situated
either side of the ProFlow printhead mechanism, figure in Step 7 refers.
7. Fit the electrical connection 9SK61 ProFlow Paste Level Sensor from the
ProFlow unit into the connector (9PL61) located on the left hand side of the
ProFlow, on the print carriage, figure in Step 2 refers.
NOTE
If Time to Go is an option, an amplifier is connected to 9PL61 and the
connection is made to 9PL62 on the amplifier.
CAUTION
ELECTRICAL CONNECTION.
This electrical connection informs the
machine of ProFlow fitment and must always be connected whilst the
ProFlow unit is fitted otherwise damage may occur if machine is run.
External Solvent
Tank
To connect the external solvent tank carry out the following:
1. Remove the rear panel using the maintenance key.
2. Place the external solvent tank on the floor beneath its intended location,
either at the rear or either side of the machine.
3. Supporting its weight, lift the external solvent tank and locate the mounting
bracket on the machine frame.
4. Tighten the two M6 cap head securing screws.
5. Place a full solvent container into the external solvent tank.
6. Remove the cap from the solvent container.
7. Fit the combined cap and 4mm tubing to the solvent container.
Securing Screws
Machine Frame Cross Section
Mounting Bracket
TRANSPORTATION
MAJOR RELOCATION
34.92 Technical Reference Manual Chapter Issue 7 Oct 06
8. Connect the 4mm tubing from the external solvent tank to the solvent fluid
connector on the external services panel.
9. Connect the cable from the external solvent tank to 9SK69 on the external
services panel.
10. Fit the rear cover.
11. Slide the angle brackets towards the machine cover, ensuring that either the
vertical or sloping side as appropriate, abuts the machine cover.
12. Tighten the two M5 cap head securing screws.
Other Items The following items are to be fitted, if applicable:
• Barcode readers
• Interactiv headset
• Paste cartridge
• Squeegees
•Tooling
View on Rear of Machine
POWER ON
PART No. 160740
M/C AVAILABLE
BOARD AVAILABLE
BOARD PASS
D
O
W
N
L
IN
E
BOARD AVAILABLE
BOARD PASS
M/C AVAILABLE
U
P
L
IN
E
FMI POD
Solvent Fluid
Connector
Solvent Sensor
9SK69
Machine Cover
Securing Screws
Angle Brackets
TRANSPORTATION
PRE POWER UP CHECKS
Chapter Issue 7 Oct 06 Technical Reference Manual 34.93
PRE POWER UP CHECKS
Electrical Test Before the machine is connected to the factory electrical supply, the following
electrical tests must be performed:
1. Ensure the mains isolator switch is in the OFF position.
2. Remove the front cover of the machine to gain access to the mains isolator
switch.
3. Remove the front cover of the mains isolator switch.
4. Perform a visual inspection of the mains isolator switch ensuring the follow-
ing:
a. The earth input and earth output cables are connected to the earth tag.
b. The live input is connected to the top of the isolator switch on the left hand
side.
c. The live output is connected to the bottom of the isolator switch on the left
hand side.
d. The neutral input is connected to the top of the isolator switch on the right
hand side.
e. The neutral output is connected to the bottom of the isolator switch on the
right hand side.
5. Ensure that all six cables are secure and no bare wires are showing.
6. Connect the two probes of a digital volt meter (DVM) together and ensure
that the DVM is reading 0Ω.
Neutral (Blue)
Input
Isolator Mount
Securing Nut
(in 3 positions)
Isolator Mount
Live (Brown)
Input
Earth (Green/Yellow)
Input
Earth (Green/Yellow)
Output
Earth Tag
Live (Brown)
Output
Neutral (Blue)
Output