MAN00000772_SI-G200BB_SVCPDFA.pdf - 第148页

O pe r a ti on Guide W o rk Pr ocess Parts R e placem ent Maintenan ce I ntended i tem S I -G200 A A BB Docume n t no. W KGB - 20105-0 1 Page 6/8 Enlarg ed (Compl eted 2 spot s, lef t side) Enlarg ed (Compl eted 2 spot s…

100%1 / 712
Operation Guide Work Process Parts Replacement Maintenance
Intended item SI-G200 AA BB
Document no. WKGB-20105-01
Page 5/8
3. Taking off SH terminals of X-Y relay
Loosen 4 P4 x 6 to take off SH terminal on cable relay plate. It is not necessary taking off SH
terminals which is from
XFM2(XRM2) beneath cable relay plate. After taking off SH terminals fix 4
P4 x 6 and tooth lock washers.
Wrap SH Terminal with plastic tape to fix nylon tie
This process should be done for each by 2 spots on right and left side.
Work spot
Enlarged
2 spots, left side
Operation Guide Work Process Parts Replacement Maintenance
Intended item SI-G200 AA BB
Document no. WKGB-20105-01
Page 6/8
Enlarged (Completed 2 spots, left side)
Enlarged (Completed 2 spots, right side)
Operation Guide Work Process Parts Replacement Maintenance
Intended item SI-G200 AA BB
Document no. WKGB-20105-01
Page 7/8
4. Taking off SH terminals of upper frame
Loosen 2 P4 x 6 to take off SH terminal from XFM1 (XRM1), XFM2 (XRM2). After taking off SH
terminals fix 2 P4 x 6 and tooth lock washers.
Wrap SH Terminal with plastic tape to fix nylon tie
This process should be done for front and rear side.
Y Cable rear side Y Cable front side
Work spot
Enlarged
2 spots
Machine front left Machine front right