MAN00000772_SI-G200BB_SVCPDFA.pdf - 第233页
Calibration HLGB-10308-01 Pickup Check Camera Calibration SHEET 3/5 7 Install the length refe rence nozzle jig to the turret No.1 and press the [ST ART] button on the operation panel. When installi ng the no zzle, insert…

Calibration
HLGB-10308-01
Pickup Check Camera Calibration
SHEET
2/5
4 Click the Calibration Start button.
“Press [ORG] button to start homing” is displayed on
the message screen.
5 Press the [ORG] button on the operation
panel.
Origin position return is performed and “Install jig
onto plate” is displayed on the message screen.
6 Set a detection resolution check jig into the
insertion hole on the calibration plate jig, and
press the [START] button on the operation
panel.
Head portion moves to the jig setup position, and
“Install nozzle for pickup inspection to index 1” is
displayed on the message screen.
Calibration plate upper surface figure
Insertion hole

Calibration
HLGB-10308-01
Pickup Check Camera Calibration
SHEET
3/5
7 Install the length reference nozzle jig to the
turret No.1 and press the [START] button on
the operation panel.
When installing the nozzle, insert it while
slowly turning.
After inserting the nozzle, check that it is not
drawn out by pulling downward.
The length reference nozzle jig moves to the
measuring position and “ Press [START] to start
nozzle measurement” is displayed on the message
screen.
8 Press the [START] button on the operation
panel.
Length reference nozzle jig measurement is
performed and “ Press [START] to start jig
measurement” is displayed on the message screen.
Check that end of the reference jig nozzle is displayed
on the HEIGHT DISPLAY at this time.
9 Press the [START] button on the operation
panel.
The reference position nozzle picks up the detection
resolution check jig, and measurement is made.
Length reference
nozzle jig

Calibration
HLGB-10308-01
Pickup Check Camera Calibration
SHEET
4/5
Check that the detection resolution check jig is
displayed on the HEIGHT DISPLAY at this time.
When measurement of the detection resolution check
jig is ended, the head moves to the supply section.
10 Remove the detection resolution check jig
from the nozzle and press the [ORG] button
on the operation panel.
Origin position return is performed and “Install jig
onto plate” is displayed on the message screen.
11 Continuously, make a second jig
measurement.
1. Again set the pickup check resolution
inspection jig onto the calibration
plate jig and press the [START] button
on the operation panel.
The length reference nozzle jig moves to the
measuring position and “Press [START] to start
nozzle measurement” is displayed on the
message screen.
2. Perform operations from nozzle
recognition to jig measurement
similarly to the procedure 8 to 9.
12 When the second measurement is ended,
press the [START] button to move the head
to nozzle installing position.
Turret No.1 moves to the nozzle installing position
and “Remove the pickup check nozzle” is displayed
on the message screen.