MAN00000772_SI-G200BB_SVCPDFA.pdf - 第182页
Set-up HLGB-10204-01 PWB Camera Setup SHEET 2/4 4. Click the PWB Cam era Setup button on the Machine Set up screen. PWB Camera Setup screen is displayed. 3 Set brightness of the PWB camera light to “6” or “7”. 4 Move the…

Set-up
HLGB-10204-01
PWB Camera Setup
SHEET
1/4
PWB Camera Setup
Perform this working on both heads on the front side and rear side.
[Necessary jigs]
• Thickness gauge (t=1.0 mm)
[Procedure]
1 Perform the origin position return on the HI screen.
1. When the CALIBRATION screen is displayed, press the Complete button to return to the
HI screen.
2. Press the [ORG] button on the operation panel.
Origin position return is performed.
2 Display PWB Camera Setup screen.
1. Click in an order of M/C SETUP menuM/C MAINTENANCE tabCalibration button.
“Head at opposite position will be moved to noninterference area. Press the [START] button if you are really OK.”
is displayed on the message screen.
2. Press the [START] button on the operation panel.
CALIBRATION screen is displayed.
For procedures when selecting head for which calibration is performed, and when changing calibration jig,
refer to the “How to display calibration screen (HLGB-10105-01)”.
3. Click the Machine Setup button.
Machine Setup screen is displayed.
Thickness gauge

Set-up
HLGB-10204-01
PWB Camera Setup
SHEET
2/4
4. Click the PWB Camera Setup button
on the Machine Setup screen.
PWB Camera Setup screen is displayed.
3 Set brightness of the PWB camera light to
“6” or “7”.
4 Move the head to a position where the
transfer rail is displayed on the PCBOARD
DISPLAY screen.
1. Click the XY button on the PWB
Camera Setup screen.
XY Axis screen is displayed.
2. Click the Jog Move button.
3. Press the cursor key to jog-move the
head part onto the transfer rail.

Set-up
HLGB-10204-01
PWB Camera Setup
SHEET
3/4
Jog-move the head part until the level difference
part is displayed on the PCBOARD DISPLAY
screen.
* A section displayed in white on the PCBOARD
DISPLAY screen is transfer rail.
5 Adjust position of the PWB camera.
1. Loosen cap screws (2-CP4x8) fixing
the PWB camera.
2. Put thickness gauge of 1.0mm between
the PWB camera and the camera
support bracket and temporarily fix
them.
3. Adjust inclination of the transfer rail
displayed on the PCBOARD DISPLAY
screen so as to align it with the
cross-hair line.
4. After adjusting inclination, tighten the
cap screws (2-CP4x8) to fix the PWB
camera.
5. Remove the thickness gauge.
Transfer rail
Illumination light
PWB camera
Camera Support
bracket
Eyepiece tube
Thickness gauge
CP4x8