MAN00000772_SI-G200BB_SVCPDFA.pdf - 第326页

Adjustment HLGB-10414-01 Phase A djustment for Nozzle SHEET 1/7 Phase Adjustment for Nozzle Perform this working on both heads on the front sid e and rear side. [Necessary jigs] A Phase adjusting jig (1) B Phase adjustin…

100%1 / 712
Adjustment
HLGB-10413-01
Nozzle Escape Detect Sensor
Position Adjustment
SHEET
5/5
8 Check that the sensor is turned off at a
position where H axis is lowered by -1.5 mm.
1. On the RN/H Axis screen, click check
box for H axis and put check in it to
input “-1.5”.
2. Press the [START] button on the
operation panel.
H axis lowers to a position of -1.5 mm.
3. Check that the sensor is turned off.
Do not confuse the lowering dimension when checking sensor OFF and the lowering dimension for
setting threshold.
Item H Axis lowering dimension
Threshold setting -1.3 mm
Sensor OFF check -1.5 mm
9 This is the end of setting of the nozzle omission detection sensor.
1. Close the cover for the nozzle omission detection sensor amplifier.
2. Remove the nozzle for production installed on the head.
Adjustment
HLGB-10414-01
Phase Adjustment for Nozzle
SHEET
1/7
Phase Adjustment for Nozzle
Perform this working on both heads on the front side and rear side.
[Necessary jigs]
A Phase adjusting jig (1)
B Phase adjusting jig (2)
C Pull-out jig
D Torque driver (15[cNm]40[cNm])
[Procedure]
1 Turn off the VACUUM breaker.
Turn OFF the VACUUM breaker before
removing the mechanical valve in order to
prevent suction of contaminant and dust from
the mechanical valve.
1. Loosen the screws (2+T4×8) to
remove the lower cover on the back of
the unit.
2. Turn off the VACUUM breaker on the
power unit part.
Lower cover
VACUUM breaker
A
B
D
C
Adjustment
HLGB-10414-01
Phase Adjustment for Nozzle
SHEET
2/7
2 Move the head to a position by manual
operation where working can be easily
performed.
1. Click in an order of MANUAL menu
AXIS MOTION tab XY button.
XY Axis screen is displayed.
2. Click the Jog Move button in the move
mode.
3. Press the right cursor to jog-move the
head to vicinity of No.120 of head
supply part.
4. Click the Return button to close the
XY Axis screen.
3 Remove the mechanical valve.
1. Loosen CP-3x10 to remove the
mechanical valves for Index 1 and
Index 2.
Mechanical valve