4OM-1345-009_w.pdf - 第161页
3-13 AKHEMT -ID Erroe ID Error Name, Description, Cause, and Remedy 421301 Input Buffer Cnvr . Error The carrying in operation was not able to begin. ----- 421302 Input Buffer Cnvr . Error The error was detected while ca…

3-12-1
AKHEMT-ID
Erroe ID Error Name, Description, Cause, and Remedy
421201 Input Buffer Cnvr. PCB Detection
PCB’s were at inlet and outlet of cnvr.
-----
421202 Input Buffer Cnvr. PCB Detection
There is no PCB on the conveyer. The PCB fell while moving to the arrangement
position.
Please continue production after checking whether the PCB has fallen around a
conveyor.
421203 Input Buffer Cnvr. PCB Detection
There is a PCB on the conveyer. The substrate was not able to be exhausted.
Please continue the work after checking the PCB on a conveyor.
421204 Input Buffer Cnvr. PCB Detection
There is no PCB on the conveyer. After the PCB carrying in ended, it can not able to
be detected.
Please continue the work after checking the PCB on a conveyor.
421205 Input Buffer Cnvr. PCB Detection
Positioning change operation when beginning to be operated, the PCB was
detected with the entrance sensor. Please remove it.
Please remove the PCB of a conveyor entrance.
421206 Input Buffer Cnvr. PCB Detection
The PCB was detected by the entrance sensor with the PCB was not able to be
transferred.
Please remove the PCB of a conveyor entrance.
421207 Input Buffer Cnvr. PCB Detection
The PCB was detected with the conveyer exit sensor. Please confi rm the PCB on
the conveyer.
Please continue the work after checking the PCB on a conveyor.
421208 Input Buffer Cnvr. PCB Detection
Manual bypass of the PCB was carried out in the state where a PCB is on a
conveyor.
Please remove the PCB carried out by manual bypass. Production can be
continued.
421209 Input Buffer Cnvr. PCB Detection
The PCB was not found in the proper position.
Please remove the PCB on a conveyor. Production can be continued.
0605-001
3.3 Conveyor

3-13
AKHEMT-ID
Erroe ID Error Name, Description, Cause, and Remedy
421301 Input Buffer Cnvr. Error
The carrying in operation was not able to begin.
-----
421302 Input Buffer Cnvr. Error
The error was detected while carrying in was operating.
Please continue the work after checking the PCB on a conveyor.
421303 Input Buffer Cnvr. Error
The exhaust operation was not able to begin.
-----
421304 Input Buffer Cnvr. Error
The error was detected while exhaust was operating.
Please continue the work after checking the PCB on a conveyor.
421305 Input Buffer Cnvr. Error
The PCB transport to receiving position was not able to begin.
-----
421306 Input Buffer Cnvr. Error
The error was detected while transporting to the receiving position.
-----
421307 Input Buffer Cnvr. Error
The operation moving to the arrangement position was not able to begin.
-----
421308 Input Buffer Cnvr. Error
The error was detected while transporting to the arrangement position.
-----
421309 Input Buffer Cnvr. Error
The input machine work transfer signal was turned off before the completion of PCB
carrying-in operation.
Please continue the work after checking the PCB on a conveyor.
421310 Input Buffer Cnvr. Error
The reversal positioning operation was not able to begin.
-----
421311 Input Buffer Cnvr. Error
The error was detected while the reversal positioning was operating.
Please continue the work after checking the PCB on a conveyor.
0605-002
3.3 Conveyor

3-14
AKHEMT-ID
Erroe ID Error Name, Description, Cause, and Remedy
422101 Cnvr. Positioning 1 Overtime
PCB from inp. buffer Cnvr. was not received.
Please continue the work after checking the PCB on a conveyor.
422103 Cnvr. Positioning 1 Overtime
The rising operation of the backup base did not end in prescribed time.
-----
422104 Cnvr. Positioning 1 Overtime
The descent operation of the backup base did not end in prescribed time.
-----
422105 Cnvr. Positioning 1 Overtime
The PCB transport (exhaust) to output cnvr. did not end in prescribed time.
Please continue the work after checking the P.C.B on a conveyor.
422106 Cnvr. Positioning 1 Overtime
The reversal positioning operation did not end in prescribed time.
Please continue the work after checking the PCB on a conveyor.
422107 Cnvr. Positioning 1 Overtime
The reversal positioning operation did not end in prescribed time.
Please continue the work after checking the PCB on a conveyor.
422201 Cnvr. Positioning 1 PCB Detection
PCB’s were at inlet and outlet of cnvr.
Please continue the work after checking the PCB on a conveyor.
422202 Cnvr. Positioning 1 PCB Detection
There is no PCB on the conveyer. After the PCB carrying is ended, it can not be
detected.
Please continue the work after checking the PCB on a conveyor.
422203 Cnvr. Positioning 1 PCB Detection
No PCB on the cnvr. After positioning released, PCB could not be detected.
Please continue the work after checking the PCB on a conveyor.
422204 Cnvr. Positioning 1 PCB Detection
The conveyer entrance sensor detected PCB.
Please continue the work after checking the PCB on a conveyor.
422205 Cnvr. Positioning 1 PCB Detection
The PCB that has not been positioned exists.
Please position the PCB
422206 Cnvr. Positioning 1 PCB Detection
An unsuitable detected state of the sensor is being kept.
When you remove the factor which the sensor has detected and there is a PCB in
the way of carrying in, please return on input buffer cnvr. and resume production by
WarmStart.
422207 Cnvr. Positioning 1 PCB Detection
The PCB was unsuitable detected at the time of a carrying-in operation start.
Please check whether the sensor of a conveyor is operating normally and check
whether a PCB can convey normally by manual conveyance.
0609-003
3.3 Conveyor