AltaPail II Bulk Melters Product Manual.pdf - 第147页

Maintenanc e 8-10 Part 1121836_03 E 11/2014 Nordson Corporation This page intentiona lly left blank.

100%1 / 230
1
Maintenance
8-9
Part 1121836_03
E 11/2014 Nordson Corporation
Gear Pump
Checking for Leakage
Variseals are fixed in place on the pump with a flange (1). If material escapes
along the shaft, the pump shaft seal must be replaced.
NOTE: A special assembly tool is needed for replacement. Refer to the
separate document Parts List. However, Nordson recommends replacing the
pump and sending the old one in to be repaired. Refer to page 10-2,
Replacing Gear Pump.
Maintenance
8-10
Part 1121836_03
E 11/2014 Nordson Corporation
This page intentionally left blank.
Troubleshooting
9-1
Part 1121836_03
E 11/2014 Nordson Corporation
Section 9
Troubleshooting
WARNING! Allow only qualified personnel to perform the following tasks.
Follow the safety instructions in this document and all other related
documentation.
WARNING! Troubleshooting activities may sometimes have to be carried out
when the melter is energized. Observe all safety instructions and regulations
concerning energized unit components (active parts). Failure to observe may
result in an electric shock.
Safety
S
Never disconnect cables from, or reconnect cables to, the main board
while the melter is energized.
S
Before breaking any hydraulic connection, always relieve system
pressure. Refer to Relieving System Pressure in Section 7, Service.
S
Refer to the safety information provided with optional equipment.
S
If the melter is removed from its sub-base for diagnostic checks or
service, ensure that the ground lead between the chassis and the
sub-base is re-attached when the melter is reconnected to the sub-base.
NOTE: Refer to Administrative Options and Settings located in Chapter 6 of
this manual.