1.011.1_VPC使用手册.pdf - 第62页

61/144 3.2 VPC for Feature Evaluation In the default configurat ion of the VPC evaluation, only one analysis of the recognized defects combined with the repair results is done. If displacement values (for paste check or …

100%1 / 145
60/144
3.1 Exercise 4:
Please open the production monitor and evaluate the inspection plan
6591577603_BOT. For this, change the system time to 5/3/2006, 17:00 and
enter this inspection plan in si.name.
1. Set the path to the file si.name.
2. Enter the necessary parameters for the production monitor in the
vpc.ini file.
3. Then, set the time filter to 3 hours.
61/144
3.2 VPC for Feature Evaluation
In the default configuration of the VPC evaluation, only one analysis of the
recognized defects combined with the repair results is done.
If displacement values (for paste check or components in paste) also have to be
displayed, it is necessary to create a file "inspection plan name.spc.conf" in the
respective inspection plan directory.
3.2.1 Creating a spc.conf file
Creating the file "inspectionplanname.spc.conf" manually takes a lot of time. So,
it is possible to create a complete inspectionplanname.spc.conf. Unnecessary
information can be deleted manually. An "inspectionplanname.spc.conf" file is
created in the AOI menu with the following menu command:
62/144
If this menu command is not active or not available at all, it can be activated
using the file si_mfc.men.
After this menu command is chosen, the following mask appears on the screen:
If the inspection plan is already prepared, this message can be confirmed. If
not, the message has to be closed by clicking "Cancel" and the inspection plan
has to be prepared again before the spc.conf file is created.
The system creates a file "inspectionplanname.spc.conf" that is saved in the
cad directory of the corresponding inspection plan.
The file is edited using the menu command, edit spc.conf.
Unnecessary feature values should be removed from spc.conf to reduce the
amount of data.