c900773.R02_EN.pdf - 第118页

6 . Additional Function 2 Dispense Head Placement of Dispense Head Mount head needs to be changed to dispense head. Removal of Nozzle Holder Remove the fl ange. Remove the nozzl e holder. Place the dispense holder. Loose…

100%1 / 148
6Additional Function
1
6
Additional Function
Dispense Head
DOT STATION
CTF40,CFB-36/E
6Additional Function
2
Dispense Head
Placement of Dispense Head
Mount head needs to be changed to dispense head.
Removal of Nozzle Holder
Remove the flange.
Remove the nozzle holder.
Place the dispense holder.
Loosen the flange with a wrench.
WRENCH, 12-1NM
LE6-M5W22-000
Loosen the flange.
Pull the nozzle holder downwards.
6Additional Function
3
Fix the dispense holder.
Place the dispense head.
Fix the dispense head.
End
Tighten the flange with a wrench.
WRENCH, 14-5NW
LE6-M5W22-100
Adjust the rotation angle of the
dispense head and insert it to the
dispense holder.
Tighten the secure knob and fix the
dispense head.